Details
Invoice
- CreationDate
- 11/17/2023
- Vehicle
- D95 - Driver D95
- Work
- 11-10-2023 TO 11-16-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 71054806 | D95 | P13 | (81905) Calder Rd Widening | 7PSSDB | 18.31 | 4.6 (4.7) | 84.23 (86.06) | |
| 71054870 | D95 | P13 | (90675) FREEPORT STREET RECON PH. 2 (Ave A) | 5PSSDB | 18.05 | 8.25 (8.35) | 148.91 (150.72) | |
| 71054766 | D95 | P13 | (70671) Galveston County - 23rd Street Rehab | 5PSSDB | 18.28 | 9.2 (9.3) | 168.18 (170) | |
| 71054813 | D95 | P13 | (70671) Galveston County - 23rd Street Rehab | 5PSSDB | 18.3 | 9.2 (9.3) | 168.36 (170.19) | |
| 71054828 | D95 | P13 | (70671) Galveston County - 23rd Street Rehab | 5PSSDB | 18.26 | 9.2 (9.3) | 167.99 (169.82) | |
| 71054850 | D95 | P13 | (70629) Great Wolf Lodge | 5PSSDB | 18.18 | 6.1 (6.2) | 110.9 (112.72) | |
| 71054860 | D95 | P13 | (70629) Great Wolf Lodge | HSBT | 1 | 65 (65) | 65 (65) | |
| 71054780 | D95 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 18.29 | 4.8 (4.9) | 87.79 (89.62) | |
| 71054796 | D95 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 18.24 | 4.8 (4.9) | 87.55 (89.38) | |
| 71054861 | D95 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 18.24 | 4.8 (4.9) | 87.55 (89.38) | |
| 71054842 | D95 | P13 | (92785) Westlawn and Highland Drainage Improv | 7PSSDB | 18.16 | 6.05 (6.15) | 109.87 (111.68) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|