Details
Invoice
- CreationDate
- 11/10/2023
- Vehicle
- D15 - Driver D15
- Work
- 11-03-2023 to 11-09-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34127452 | D15 | P8 | (89496) (Tall Willow & Chateu Forest) City Wide Project 1 | 9PSCC | 17.08 | 5.85 (5.95) | 99.92 (101.63) | |
| 34127164 | D15 | P8 | (93703) CHRIS - Garden Oaks & Shepherd Park West Drainage | 5PSSDB | 17.03 | 4.8 (4.9) | 81.74 (83.45) | |
| 34127382 | D15 | P8 | (89426) CNP Danek Substation | 5PSLSB | 17.07 | 5.6 (5.7) | 95.59 (97.3) | |
| 34127359 | D15 | P8 | (94163) COH - 9310 Glencroft St | 10PSCCA | 17.22 | 3.15 (3.25) | 54.24 (55.97) | |
| 34127148 | D15 | P8 | (94163) COH - 9310 Glencroft St | 10PSCCA | 17.07 | 3.15 (3.25) | 53.77 (55.48) | |
| 34127417 | D15 | P8 | (78018) Coolwood Head Start Facility | 5PSSDB | 17.12 | 4.6 (4.7) | 78.75 (80.46) | |
| 34127247 | D15 | P8 | (78018) Coolwood Head Start Facility | 5PSSDB | 17.07 | 4.6 (4.7) | 78.52 (80.23) | |
| 34127325 | D15 | P8 | (94711) Coppertree Village Detention | 7PSSDB | 17.07 | 4.2 (4.3) | 71.69 (73.4) | |
| 34126913 | D15 | P8 | (73205) Excavation of Inwood Forest Detention Basin | 10PSSDA | 17.1 | 4.8 (4.9) | 82.08 (83.79) | |
| 34127044 | D15 | P8 | (93987) FY2023 SWATT ctr # 5 - Tammarack Woods | 5PSSDB | 17.12 | 4.2 (4.3) | 71.9 (73.62) | |
| 34127018 | D15 | P8 | (25434) Garden Oaks & shepherd Park West Drainage | 5PSSDB | 17.2 | 4.8 (4.9) | 82.56 (84.28) | |
| 34126958 | D15 | P8 | (77150) Houston Food Bank | 5PSSDB | 17.09 | 4.6 (4.7) | 78.61 (80.32) | |
| 34127124 | D15 | P8 | (90403) LAKEWOOD PINES 15&16 | 5PSSDB | 17.02 | 4.05 (4.15) | 68.93 (70.63) | |
| 34126949 | D15 | P8 | (89800) Wayside Village Sec 13 | 5PSSDB | 17.09 | 3.35 (3.45) | 57.25 (58.96) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|