Details
Invoice
- CreationDate
- 09/10/2026
- Vehicle
- D167 - Jose Zayas
- Work
- 09-03-2026 to 09-09-2026
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 1973095030 | D167 | P3 | (323-7355) Blinn- Waller Campus | 5PSSDB | 18.76 | 6.1 (6.2) | 114.44 (116.31) | |
| 1973094898 | D167 | P3 | (323-5746) Fieldstone Landing MG & Det | 5PSSDB | 18.62 | 5.05 (5.15) | 94.03 (95.89) | |
| 1973095255 | D167 | P3 | (323-7143) Fulshear Lakes Lakeside Park Sec 5 WSDP | 7PSSDB | 18.78 | 6.85 (6.95) | 128.64 (130.52) | |
| 1973095060 | D167 | P3 | (323-5946) Katy West Improve- bluebonnet and cedar In | 7PSSDB | 18.76 | 5.05 (5.15) | 94.74 (96.61) | |
| 1973094857 | D167 | P3 | (323-8268) Laurel Farms Sec 2 - PEDRO | 7PSSDB | 18.6 | 6.85 (6.95) | 127.41 (129.27) | |
| 1973094929 | D167 | P3 | (323-8268) Laurel Farms Sec 2 - PEDRO | 7PSSDB | 18.59 | 6.85 (6.95) | 127.34 (129.2) | |
| 1973095402 | D167 | P3 | (323-7598) MH Katy North Parking Lot | 5PSSDB | 18.79 | 5.2 (5.3) | 97.71 (99.59) | |
| 1973095296 | D167 | P3 | (323-5649) MUG Access 23 Pad Sites | 7PSSDB | 18.83 | 5.2 (5.3) | 97.92 (99.8) | |
| 1973095325 | D167 | P3 | (323-8256) NW 99 DC II | 5PSSDB | 18.72 | 6.1 (6.2) | 114.19 (116.06) | |
| 1973094969 | D167 | P3 | (323-8151) Riverway Farms Sec 1 | 5PSSDB | 18.53 | 6.1 (6.2) | 113.03 (114.89) | |
| 1973095437 | D167 | P3 | (323-8151) Riverway Farms Sec 1 | 5PSSDB | 18.79 | 6.1 (6.2) | 114.62 (116.5) | |
| 1973095367 | D167 | P3 | (323-5622) Tx Heritage Marketplace Tracts 2 5 20 and 21 | 5PSSDB | 18.75 | 6.1 (6.2) | 114.38 (116.25) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|