Details
Invoice
- CreationDate
- 01/29/2026
- Vehicle
- D132 - Driver D132
- Work
- 01-22-2026 TO 01-28-2026
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 1972011884 | D132 | P15 | (323-4746) ALIEF FCCU - SPEARS CONSTRUCTION LLC DBA PAVEPRO | 7PSSDB | 18.89 | 6.1 (6.2) | 115.23 (117.12) | |
| 1972012091 | D132 | P15 | (323-4745) Culvert Extension | 7PSSDB | 18.95 | 4.1 (4.2) | 77.69 (79.59) | |
| 1972012094 | D132 | P15 | (323-162) Easthaven Div Package 1 | 5PSSDB | 18.93 | 5.1 (5.2) | 96.54 (98.44) | |
| 1972012081 | D132 | P15 | (323-4154) Griggs Rd COH WW Collotn Systm Rhb and Rnwl | 5PSSDB | 18.88 | 5.6 (5.7) | 105.73 (107.62) | |
| 1972011916 | D132 | P15 | (323-4560) Hanover Sugar Land | 5PSSDB | 18.92 | 5.85 (5.95) | 110.68 (112.57) | |
| 1972011897 | D132 | P15 | (323-1373) Hightower | 7PSSDB | 18.91 | 4.1 (4.2) | 77.53 (79.42) | |
| 1972011929 | D132 | P15 | (323-1373) Hightower | 7PSSDB | 18.89 | 4.1 (4.2) | 77.45 (79.34) | |
| 1972011958 | D132 | P15 | (323-2539) IDV Beechnut | 5PSSDB | 18.9 | 5.6 (5.7) | 105.84 (107.73) | |
| 1972011906 | D132 | P15 | (323-969) PROJECT 62 - MILK PAVEMENT RESTORATION | 7PSSDB | 18.94 | 5.05 (5.15) | 95.65 (97.54) | |
| 1972011948 | D132 | P15 | (323-969) PROJECT 62 - MILK PAVEMENT RESTORATION | 7PSSDB | 18.91 | 5.05 (5.15) | 95.5 (97.39) | |
| 1972011998 | D132 | P15 | (323-969) PROJECT 62 - MILK PAVEMENT RESTORATION | 7PSSDB | 18.9 | 5.05 (5.15) | 95.44 (97.34) | |
| 1972011939 | D132 | P15 | (323-3665) WEST AIRPORT PHASE 2 | 5PSSDB | 18.9 | 4.3 (4.4) | 81.27 (83.16) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|