Details
Invoice
- CreationDate
- 07/07/2023
- Vehicle
- D136 - Driver D136
- Work
- 06-30-2023 TO 07-06-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34112452 | D136 | P8 | (86710) "108 "" WATER LINE- Cotillion Dr" | 5PSSDB | 18.24 | 4 (4.1) | 72.96 (74.78) | |
| 34112444 | D136 | P8 | (86710) "108 "" WATER LINE- Cotillion Dr" | 5PSSDB | 18.19 | 4 (4.1) | 72.76 (74.58) | |
| 34113107 | D136 | P8 | (60604) City of Morgan's Point East Side Reconstruction | SHORTLOAD | 1 | 35 (35) | 35 (35) | |
| 34113106 | D136 | P8 | (60604) City of Morgan's Point East Side Reconstruction | 7PSSDB | 10.22 | 7.2 (7.3) | 73.58 (74.61) | |
| 34113045 | D136 | P8 | (63718) Harris Co. Hwy- 146 BAYTOWN | 5PSSDB | 18.25 | 7.9 (8) | 144.18 (146) | |
| 34112271 | D136 | P8 | (85018) MEADOWS SECTION 3 PH 2 | 5PSSDB | 18.33 | 7.2 (7.3) | 131.98 (133.81) | |
| 34113231 | D136 | P8 | (85018) MEADOWS SECTION 3 PH 2 | 5PSSDB | 18.33 | 7.7 (7.8) | 141.14 (142.97) | |
| 34113193 | D136 | P8 | (85018) MEADOWS SECTION 3 PH 2 | 5PSSDB | 18.24 | 7.7 (7.8) | 140.45 (142.27) | |
| 34113247 | D136 | P8 | (85018) MEADOWS SECTION 3 PH 2 | 5PSSDB | 18.3 | 7.7 (7.8) | 140.91 (142.74) | |
| 34113132 | D136 | P8 | (85018) MEADOWS SECTION 3 PH 2 | 5PSSDB | 18.25 | 7.7 (7.8) | 140.52 (142.35) | |
| 34113214 | D136 | P8 | (16357) Northline Drainage & Paving | 5PSSDB | 18.18 | 3.95 (4.05) | 71.81 (73.63) | |
| 34113072 | D136 | P8 | (16357) Northline Drainage & Paving | 5PSSDB | 18.27 | 3.95 (4.05) | 72.17 (73.99) | |
| 34112462 | D136 | P8 | (73629) Star Stop 124 (Hamerly) | 5PSSDB | 18.14 | 5.35 (5.45) | 97.05 (98.86) | |
| 34112470 | D136 | P8 | (87977) Winzer park Drainage Improv -WALCOTT LANE/FY2023 L | 5PSSDB | 18.24 | 4.1 (4.2) | 74.78 (76.61) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|