Details

Invoice


CreationDate
10/30/2025
Vehicle
D99 - Driver D99
Work
10-23-2025 TO 10-29-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
1972007871 D99 P15 (323-1556) Bumet Bayland Park Phase 1 10PSSDA 17.31 6.1 (6.2) 105.59 (107.32)
1972007859 D99 P15 (323-1556) Bumet Bayland Park Phase 1 10PSSDA 17.27 6.1 (6.2) 105.35 (107.07)
1975003205 D99 P16 (323-3313) Caldwell Crossing Sec 5 5PSSDB 16.44 3.4 (3.5) 55.9 (57.54)
1972007911 D99 P15 (323-2988) City Park Bldg 5 5PSSDB 17.08 4.85 (4.95) 82.84 (84.55)
1972007923 D99 P15 (323-4082) COH TDO Panel Replace - 5200 Fuqua 7PSSDB 17.21 4.85 (4.95) 83.47 (85.19)
1972008031 D99 P15 (323-4118) Fort Bend Parkway Entrance Ramp 5PSSDB 17.24 4.45 (4.55) 76.72 (78.44)
1972007890 D99 P15 (323-3506) FY2023 ST and DRH CONTRACT 2 RUTH ST - STAB ONLY 7PSSDB 17.3 5.85 (5.95) 101.2 (102.94)
1972007851 D99 P15 (323-3254) Junction Shaver and Broadway 5PSSDB 17.13 5.85 (5.95) 100.21 (101.92)
1972008019 D99 P15 (323-3254) Junction Shaver and Broadway 5PSSDB 17.36 5.85 (5.95) 101.56 (103.29)
1972007989 D99 P15 (323-3254) Junction Shaver and Broadway 5PSSDB 17.23 5.85 (5.95) 100.8 (102.52)
1972007964 D99 P15 (323-3254) Junction Shaver and Broadway 5PSSDB 17.28 5.85 (5.95) 101.09 (102.82)
1972007930 D99 P15 (323-1959) Kirby 288 5PSSDB 17.28 5.05 (5.15) 87.26 (88.99)
1972007956 D99 P15 (323-2902) Sienna 75 WSD 5PSSDB 17.24 3.6 (3.7) 62.06 (63.79)
1975003222 D99 P16 (323-2904) Sienna 86 7PSSDB 17.26 4.1 (4.2) 70.77 (72.49)
1975003212 D99 P16 (323-2904) Sienna 86 7PSSDB 17.35 4.1 (4.2) 71.14 (72.87)
1972007840 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.15 5.6 (5.7) 96.04 (97.76)
1972008054 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.31 5.6 (5.7) 96.94 (98.67)
1972007917 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.32 5.6 (5.7) 96.99 (98.72)
1972007904 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.22 5.6 (5.7) 96.43 (98.15)
1972007903 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.31 5.6 (5.7) 96.94 (98.67)
1972007882 D99 P15 (323-3666) TCC Gulfbelt Logistics Park 5PSSDB 17.31 5.6 (5.7) 96.94 (98.67)
1972008004 D99 P15 (323-3574) TxDOT Harris CS Bridge Repl-S Braeswood 7PSSDB 17.24 5.05 (5.15) 87.06 (88.79)
1972008042 D99 P15 (323-3574) TxDOT Harris CS Bridge Repl-S Braeswood 7PSSDB 17.4 5.05 (5.15) 87.87 (89.61)
1972007943 D99 P15 (323-3574) TxDOT Harris CS Bridge Repl-S Braeswood 7PSSDB 17.29 5.05 (5.15) 87.31 (89.04)
1975003191 D99 P16 (323-1265) TXDOT-H.CO-UA-90 - 0027-10-077 - O.S.T. 7PSSDB 16.32 5.6 (5.7) 91.39 (93.02)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total