Details

Invoice


CreationDate
06/27/2025
Vehicle
D12 - Rafael Alvarez
Work
06-19-2025 to 06-25-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
1932002869 D12 P7 323-13 10PSSDA 18.4 6.3 (6.4) 115.92 (117.76)
1932002931 D12 P7 323-671 412PSCC 18.47 6.3 (6.4) 116.36 (118.21)
1932003151 D12 P7 323-723 7PSSDB 18.51 4.85 (4.95) 89.77 (91.62)
1932002770 D12 P7 323-94 5PSSDB 18.54 4.45 (4.55) 82.5 (84.36)
1932002907 D12 P7 (323-1756) 84 W/L - DEMASCUS - B1 and B2 water supply 5PSSDB 18.48 5.85 (5.95) 108.11 (109.96)
1932003187 D12 P7 (323-1753) 96 and 84 W/L - 6510 B/W-8 5PSSDB 18.55 7.75 (7.85) 143.76 (145.62)
1938003602 D12 P12 (323-1144) AH Catering Operations Facility 5PSSDB 18.52 5.35 (5.45) 99.08 (100.93)
1938003651 D12 P12 (323-1144) AH Catering Operations Facility 5PSSDB 18.52 5.35 (5.45) 99.08 (100.93)
1932003173 D12 P7 (323-400) HC Reconstruction and Widening of Treaschwing Road 7PSSDB 18.49 4.85 (4.95) 89.68 (91.53)
1932003123 D12 P7 (323-191) HCFCD White Oak (OSCAR)Fed Flood Repair 10PSSDA 18.43 7 (7.1) 129.01 (130.85)
1932002974 D12 P7 (323-1582) Klein ISD Schindewolf Gym Additions 7PSSDB 18.54 4.45 (4.55) 82.5 (84.36)
1938003676 D12 P12 (323-1727) Meadow Edge Business Park 5PSSDB 18.5 5.85 (5.95) 108.22 (110.08)
1932002991 D12 P7 (323-412) Mercer Det. 10PSSDA 18.48 4.45 (4.55) 82.24 (84.08)
1932002889 D12 P7 (323-928) Robinson Rd 7PSSDB 18.46 4.45 (4.55) 82.15 (83.99)
1932003023 D12 P7 (323-1661) Sila Sec 4 7PSSDB 18.38 5.35 (5.45) 98.33 (100.17)
1932003075 D12 P7 (323-1661) Sila Sec 4 7PSSDB 18.5 5.35 (5.45) 98.98 (100.83)
1932003051 D12 P7 (323-1143) Spring ISD - EPI Center 5PSSDB 18.43 4.45 (4.55) 82.01 (83.86)
1938003488 D12 P12 (323-522) SPRING W MUD-TERRITORY AT SPRING STUEBNER-DET POND 7PSSDB 18.52 5.85 (5.95) 108.34 (110.19)
1932003106 D12 P7 (323-1881) Woodson Reserve Sec 31 and 32 10PSSDA 18.45 3.4 (3.5) 62.73 (64.58)
1938003630 D12 P12 (323-1881) Woodson Reserve Sec 31 and 32 5PSSDB 18.48 5.35 (5.45) 98.87 (100.72)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total