Details

Invoice


CreationDate
06/20/2025
Vehicle
D140 - Alfredo Perez Pena (F&P Trucking)
Work
06-12-2025 to 06-18-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
1973009050 D140 P3 323-1072 7PSSDB 20.08 4.1 (4.2) 82.33 (84.34)
1973009111 D140 P3 323-119 5PSSDB 20.09 5.85 (5.95) 117.53 (119.54)
1973009018 D140 P3 323-1196 7PSSDB 20.49 5.6 (5.7) 114.74 (116.79)
1973009279 D140 P3 323-1625 5PSSDB 20.11 3.15 (3.25) 63.35 (65.36)
1973009646 D140 P3 323-1880 7PSSDB 20.1 5.85 (5.95) 117.58 (119.6)
1973009072 D140 P3 323-1968 7PSSDB 20.06 5.6 (5.7) 112.34 (114.34)
1973009197 D140 P3 323-2029 7PSSDB 20.09 6.85 (6.95) 137.62 (139.63)
1973008857 D140 P3 323-424 7PSSDB 20.35 4.1 (4.2) 83.44 (85.47)
1973009019 D140 P3 323-770 10PSSDA 20.07 4.45 (4.55) 89.31 (91.32)
1973009604 D140 P3 (323-1229) Azalea Sec 1 5PSSDB 20.09 4.85 (4.95) 97.44 (99.45)
1973009753 D140 P3 (323-1229) Azalea Sec 1 5PSSDB 20.07 4.85 (4.95) 97.34 (99.35)
1973009459 D140 P3 (323-1828) Baethe Road Trunk Sewer Line - HCMUD 576 10PSSDA 20.12 4.45 (4.55) 89.53 (91.55)
1973009004 D140 P3 (323-1639) Bellamina Ph 1 Det 5PSSDB 20.54 5.05 (5.15) 103.73 (105.78)
1973008948 D140 P3 (323-1639) Bellamina Ph 1 Det 5PSSDB 20.49 5.05 (5.15) 103.47 (105.52)
1973009488 D140 P3 (323-212) Elyson Cy Fair Section 1 - WSD&P 10PSSDA 20.12 3.4 (3.5) 68.41 (70.42)
1973009159 D140 P3 (323-1092) Elyson Phase 7 Overflow Motigation Basins 7PSSDB 20.11 3.25 (3.35) 65.36 (67.37)
1973008888 D140 P3 (323-1337) FM 1093 at Flewellen 7PSSDB 20.49 5.85 (5.95) 119.87 (121.92)
1973008914 D140 P3 (323-1337) FM 1093 at Flewellen 7PSSDB 20.38 5.85 (5.95) 119.22 (121.26)
1973009495 D140 P3 (323-1658) Grand Prairie Highlands Sec 13 5PSSDB 20.08 4.85 (4.95) 97.39 (99.4)
1973009230 D140 P3 (323-1658) Grand Prairie Highlands Sec 13 5PSSDB 20.04 4.85 (4.95) 97.19 (99.2)
1973009703 D140 P3 (323-773) Heights Airline and Drexel Drainage Improv (katy) 7PSSDB 20.13 4.3 (4.4) 86.56 (88.57)
1973009300 D140 P3 (323-1747) Indigo Sec 2 Ph A 10PSSDA 20.07 6.1 (6.2) 122.43 (124.43)
1973009542 D140 P3 (323-1140) Lamar CISD ES #37 5PSSDB 20.13 5.6 (5.7) 112.73 (114.74)
1973009403 D140 P3 (323-123) Mill Creek Estates Section 8 WSDP 7PSSDB 20.05 8.15 (8.25) 163.41 (165.41)
1973009799 D140 P3 (323-1863) Project Gemini 5PSSDB 20.07 5.35 (5.45) 107.37 (109.38)
1973009353 D140 P3 (323-1863) Project Gemini 5PSSDB 20.13 5.35 (5.45) 107.7 (109.71)
1973008912 D140 P3 (323-740) SWIFT at TOMBALL BS 20.42 6.85 (6.95) 139.88 (141.92)
1973008973 D140 P3 (323-1705) Tamarron Jordan Ranch Blvd SEc 12 St Ded 5PSSDB 20.45 5.6 (5.7) 114.52 (116.57)
1973009166 D140 P3 (323-25) TX DOT FM 1463 (ELEAZAR) 7PSSDB 20.1 4.3 (4.4) 86.43 (88.44)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total