Details
Invoice
- CreationDate
- 06/06/2025
- Vehicle
- D232 - Daniel Fernandez
- Work
- 05-29-2025 to 06-04-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 1972001770 | D232 | P15 | (323-145) Belle Park FY2024 Local Drainage Program (LDP) Co | 10PSSDA | 20.04 | 5.6 (5.7) | 112.22 (114.23) | |
| 1972001820 | D232 | P15 | (323-128) Chelford 2 | 5PSSDB | 20.01 | 7.9 (8) | 158.08 (160.08) | |
| 1972001795 | D232 | P15 | (323-128) Chelford 2 | 5PSSDB | 20.01 | 7.9 (8) | 158.08 (160.08) | |
| 1972001836 | D232 | P15 | (323-1670) COH TDO Panel Replace - Mowery | 7PSSDB | 20.01 | 4.3 (4.4) | 86.04 (88.04) | |
| 1972001782 | D232 | P15 | (323-1580) Marshall HS Reno | 7PSSDB | 19.72 | 4.45 (4.55) | 87.75 (89.73) | |
| 1930000538 | D232 | P5 | (323-1830) Marshall-WWW Collec Syst Rehab and Renewal | 5PSSDB | 18.98 | 5.85 (5.95) | 111.03 (112.93) | |
| 1930000571 | D232 | P5 | (323-88) Pearland- Roadside Drainage Improvements | 7PSSDB | 19.94 | 4.85 (4.95) | 96.71 (98.7) | |
| 1930000584 | D232 | P5 | (323-1656) Sarofim Hall (Rice Univ) | 5PSSDB | 19.82 | 5.85 (5.95) | 115.95 (117.93) | |
| 1972001755 | D232 | P15 | (323-914) Sienna Sec 83 WSD | 10PSSDA | 19.96 | 3.6 (3.7) | 71.86 (73.85) | |
| 1930000553 | D232 | P5 | (323-810) STERLING LAKES DRIVE EXTENSION - WSDP | 5PSSDB | 19.89 | 3.4 (3.5) | 67.63 (69.62) | |
| 1930000559 | D232 | P5 | (323-356) The Edge Industrial Park - Pearland - Phase 1 | 7PSSDB | 19.74 | 5.35 (5.45) | 105.61 (107.58) | |
| 1972001848 | D232 | P15 | (323-333) TXDOT (McGREGOR)- SH 288-0598-01-105 | 7PSSDB | 20.02 | 5.6 (5.7) | 112.11 (114.11) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|