Details

Invoice


CreationDate
03/28/2025
Vehicle
D214 - Patrick Osemwengie
Work
03-21-2025 to 03-27-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
73090360 D214 P3 113463 7PSSDB 15.51 5.6 (5.7) 86.86 (88.41)
73090621 D214 P3 115381 10PSSDA 15.4 6.1 (6.2) 93.94 (95.48)
73090504 D214 P3 115381 10PSSDA 15.47 6.1 (6.2) 94.37 (95.91)
73090591 D214 P3 120055 5PSSDB 15.36 4.85 (4.95) 74.5 (76.03)
73090241 D214 P3 121174 5PSSDB 15.3 6.1 (6.2) 93.33 (94.86)
73090772 D214 P3 122086 10PSSDA 15.5 6.1 (6.2) 94.55 (96.1)
73090550 D214 P3 122086 10PSSDA 15.48 6.1 (6.2) 94.43 (95.98)
73090669 D214 P3 (116718) Cypress Green Section 16 5PSSDB 15.29 5.05 (5.15) 77.21 (78.74)
73090427 D214 P3 (116718) Cypress Green Section 16 5PSSDB 15.34 5.05 (5.15) 77.47 (79)
73090292 D214 P3 (116718) Cypress Green Section 16 5PSSDB 15.3 5.05 (5.15) 77.26 (78.8)
73090464 D214 P3 (116236) LAMAR CONS. ISD - #8 Mass Grading & Drainage 5PSSDB 15.38 5.6 (5.7) 86.13 (87.67)
73090850 D214 P3 (116888) Sunterra Lakes Blvd St Ded Sec 1 5PSSDB 15.44 4.85 (4.95) 74.88 (76.43)
73090839 D214 P3 (116888) Sunterra Lakes Blvd St Ded Sec 1 5PSSDB 15.46 4.85 (4.95) 74.98 (76.53)
73090811 D214 P3 (116888) Sunterra Lakes Blvd St Ded Sec 1 5PSSDB 15.42 4.85 (4.95) 74.79 (76.33)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total