Details

Invoice


CreationDate
03/14/2025
Vehicle
D12 - Rafael Alvarez
Work
03-07-2025 to 03-13-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
32090812 D12 P7 112760 5PSSDB 18.52 4.3 (4.4) 79.64 (81.49)
32091003 D12 P7 (114949) 84" WL - HOLLISTER - B1 & B2 water supply 5PSSDB 18.56 7 (7.1) 129.92 (131.78)
32090973 D12 P7 (121747) 85 Acre Declaration Church Tract 5PSSDB 18.61 3.25 (3.35) 60.48 (62.34)
32090955 D12 P7 (121747) 85 Acre Declaration Church Tract 5PSSDB 18.6 3.25 (3.35) 60.45 (62.31)
32090959 D12 P7 (102368) Excavation of Inwood Forest Detention Basin (Alex) 10PSSDA 18.62 6.3 (6.4) 117.31 (119.17)
32091070 D12 P7 (102368) Excavation of Inwood Forest Detention Basin (Alex) 10PSSDA 18.57 6.3 (6.4) 116.99 (118.85)
32091036 D12 P7 (102368) Excavation of Inwood Forest Detention Basin (Alex) 10PSSDA 18.56 6.3 (6.4) 116.93 (118.78)
32090994 D12 P7 (95596) HC Reconstruction and Widening of Treaschwing Road 7PSSDB 18.61 4.85 (4.95) 90.26 (92.12)
32091085 D12 P7 (95596) HC Reconstruction and Widening of Treaschwing Road 7PSSDB 18.62 4.85 (4.95) 90.31 (92.17)
32091095 D12 P7 (84225) HCFCD White Oak Federal Flood Damage Repair 10PSSDA 18.56 7 (7.1) 129.92 (131.78)
32090821 D12 P7 (119026) Hike & Bike Trail Park Spring Det Pond D-6 7PSSDB 18.65 4.3 (4.4) 80.19 (82.06)
32090867 D12 P7 (119026) Hike & Bike Trail Park Spring Det Pond D-6 7PSSDB 18.67 4.3 (4.4) 80.28 (82.15)
32090976 D12 P7 (102825) Lumber - Cleveland 7PSCC 18.01 6.75 (6.85) 121.57 (123.37)
32090853 D12 P7 (121642) Postwood MUD Sanitary Sewer (multiple locations ) SHORTLOADDEL 1 40 (40) 40 (40)
32090852 D12 P7 (121642) Postwood MUD Sanitary Sewer (multiple locations ) 7PSSDB 10.34 4.85 (4.95) 50.15 (51.18)
32090839 D12 P7 (98608) Robinson Rd 7PSSDB 18.52 4.45 (4.55) 82.41 (84.27)
32091059 D12 P7 (98608) Robinson Rd BS-TON 18.4 4.45 (4.55) 81.88 (83.72)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total