Details

Invoice


CreationDate
03/14/2025
Vehicle
D123 - Driver D123
Work
03-07-2025 to 03-13-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
72054033 D123 P15 101651 7PSSDB 19.6 5.6 (5.7) 109.76 (111.72)
72054075 D123 P15 115126 5PSSDB 19.74 5.6 (5.7) 110.54 (112.52)
72053994 D123 P15 117975 10PSSDA 19.55 5.6 (5.7) 109.48 (111.44)
72054088 D123 P15 118395 5PSSDB 19.61 5.6 (5.7) 109.82 (111.78)
37145550 D123 P11 (116868) Davis Harbor WSD 5PSSDB 19.53 7.5 (7.6) 146.48 (148.43)
37145591 D123 P11 (112350) LEGACY Drive Offsite Drainage 7PSSDB 19.39 6.3 (6.4) 122.16 (124.1)
37145604 D123 P11 (114551) LEGACY SEC 6 7PSSDB 19.6 5.6 (5.7) 109.76 (111.72)
37145573 D123 P11 (114551) LEGACY SEC 6 7PSSDB 19.4 5.6 (5.7) 108.64 (110.58)
72054058 D123 P15 (112207) MEADOWS PLACE - DORRANCE LANE -PH 2 7PSSDB 19.52 5.35 (5.45) 104.43 (106.38)
72054049 D123 P15 (114982) Parkway Crossing WSD&P 7PSSDB 19.55 4.1 (4.2) 80.16 (82.11)
72054023 D123 P15 (114982) Parkway Crossing WSD&P 10PSSDA 19.72 4.1 (4.2) 80.85 (82.82)
72054010 D123 P15 (112950) Pearland Industrial 5PSSDB 19.55 5.05 (5.15) 98.73 (100.68)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total