Details
Invoice
- CreationDate
- 03/07/2025
- Vehicle
- D210 - Adalberto Andino
- Work
- 02-28-2025 TO 03-06-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 75033619 | D210 | P16 | 83486 | 7PSSDB | 17.46 | 4.45 (4.55) | 77.7 (79.44) | |
| 75033637 | D210 | P16 | 83486 | 7PSSDB | 17.51 | 4.45 (4.55) | 77.92 (79.67) | |
| 72053775 | D210 | P15 | 88048 | 7PSSDB | 17.56 | 5.6 (5.7) | 98.34 (100.09) | |
| 72053787 | D210 | P15 | (91673) Anderson Road Reconstruction | 7PSSDB | 17.5 | 4.1 (4.2) | 71.75 (73.5) | |
| 72053822 | D210 | P15 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 17.47 | 4.85 (4.95) | 84.73 (86.48) | |
| 72053859 | D210 | P15 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 17.25 | 4.85 (4.95) | 83.66 (85.39) | |
| 75033592 | D210 | P16 | (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F | 5PSSDB | 17.41 | 5.85 (5.95) | 101.85 (103.59) | |
| 72053842 | D210 | P15 | (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F | 5PSSDB | 17.19 | 5.6 (5.7) | 96.26 (97.98) | |
| 72053796 | D210 | P15 | (111805) COH Sagamont WWTP Imp Projects | 5PSSDB | 17.49 | 5.6 (5.7) | 97.94 (99.69) | |
| 75033578 | D210 | P16 | (115947) Mud 57 South Inspiration Way WSD | 5PSSDB | 17.5 | 3.6 (3.7) | 63 (64.75) | |
| 75033562 | D210 | P16 | (115947) Mud 57 South Inspiration Way WSD | 5PSSDB | 17.39 | 3.6 (3.7) | 62.6 (64.34) | |
| 72053833 | D210 | P15 | (114982) Parkway Crossing WSD&P | 7PSSDB | 17.19 | 4.1 (4.2) | 70.48 (72.2) | |
| 72053763 | D210 | P15 | (102582) Red Bluff Road Drainage Improvements Pasadena | 7PSSDB | 17.54 | 6.3 (6.4) | 110.5 (112.26) | |
| 72053807 | D210 | P15 | (110328) West Detention Pond 2 and Conveyance Channel 3 | 7PSSDB | 17.51 | 4.1 (4.2) | 71.79 (73.54) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|