Details

Invoice


CreationDate
03/07/2025
Vehicle
D210 - Adalberto Andino
Work
02-28-2025 TO 03-06-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
75033619 D210 P16 83486 7PSSDB 17.46 4.45 (4.55) 77.7 (79.44)
75033637 D210 P16 83486 7PSSDB 17.51 4.45 (4.55) 77.92 (79.67)
72053775 D210 P15 88048 7PSSDB 17.56 5.6 (5.7) 98.34 (100.09)
72053787 D210 P15 (91673) Anderson Road Reconstruction 7PSSDB 17.5 4.1 (4.2) 71.75 (73.5)
72053822 D210 P15 (100010) Barry Rose WRF phase 1 7PSSDB 17.47 4.85 (4.95) 84.73 (86.48)
72053859 D210 P15 (100010) Barry Rose WRF phase 1 7PSSDB 17.25 4.85 (4.95) 83.66 (85.39)
75033592 D210 P16 (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F 5PSSDB 17.41 5.85 (5.95) 101.85 (103.59)
72053842 D210 P15 (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F 5PSSDB 17.19 5.6 (5.7) 96.26 (97.98)
72053796 D210 P15 (111805) COH Sagamont WWTP Imp Projects 5PSSDB 17.49 5.6 (5.7) 97.94 (99.69)
75033578 D210 P16 (115947) Mud 57 South Inspiration Way WSD 5PSSDB 17.5 3.6 (3.7) 63 (64.75)
75033562 D210 P16 (115947) Mud 57 South Inspiration Way WSD 5PSSDB 17.39 3.6 (3.7) 62.6 (64.34)
72053833 D210 P15 (114982) Parkway Crossing WSD&P 7PSSDB 17.19 4.1 (4.2) 70.48 (72.2)
72053763 D210 P15 (102582) Red Bluff Road Drainage Improvements Pasadena 7PSSDB 17.54 6.3 (6.4) 110.5 (112.26)
72053807 D210 P15 (110328) West Detention Pond 2 and Conveyance Channel 3 7PSSDB 17.51 4.1 (4.2) 71.79 (73.54)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total