Details
Invoice
- CreationDate
- 02/28/2025
- Vehicle
- D35 - Jose Sanchez
- Work
- 02-21-2025 to 02-27-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 37145040 | D35 | P11 | 109711 | 7PSSDB | 20.47 | 3.15 (3.25) | 64.48 (66.53) | |
| 37144792 | D35 | P11 | 110194 | 5PSSDB | 20.47 | 6.3 (6.4) | 128.96 (131.01) | |
| 37144770 | D35 | P11 | 110926 | 5PSSDB | 20.6 | 4.1 (4.2) | 84.46 (86.52) | |
| 37144956 | D35 | P11 | 110926 | 5PSSDB | 20.52 | 4.1 (4.2) | 84.13 (86.18) | |
| 37144826 | D35 | P11 | 113825 | 5PSSDB | 20.52 | 4.1 (4.2) | 84.13 (86.18) | |
| 37144701 | D35 | P11 | 116566 | 5PSSDB | 20.61 | 3.6 (3.7) | 74.2 (76.26) | |
| 37144970 | D35 | P11 | 116566 | 5PSSDB | 20.43 | 3.6 (3.7) | 73.55 (75.59) | |
| 37144927 | D35 | P11 | 116566 | 5PSSDB | 20.44 | 3.6 (3.7) | 73.58 (75.63) | |
| 37144711 | D35 | P11 | 118395 | 5PSSDB | 20.62 | 5.6 (5.7) | 115.47 (117.53) | |
| 37144917 | D35 | P11 | 120620 | 10PSSDA | 20.49 | 6.1 (6.2) | 124.99 (127.04) | |
| 37144808 | D35 | P11 | 88048 | 7PSSDB | 20.49 | 5.85 (5.95) | 119.87 (121.92) | |
| 37144904 | D35 | P11 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 20.48 | 5.05 (5.15) | 103.42 (105.47) | |
| 37145064 | D35 | P11 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 20.45 | 5.05 (5.15) | 103.27 (105.32) | |
| 37144853 | D35 | P11 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 20.47 | 5.05 (5.15) | 103.37 (105.42) | |
| 37145033 | D35 | P11 | (103670) CALDWELL LAKES SEC 1 | 7PSSDB | 20.49 | 3.4 (3.5) | 69.67 (71.72) | |
| 37144725 | D35 | P11 | (116751) CNP Alvin Substation | 5PSLSB | 20.59 | 4.85 (4.95) | 99.86 (101.92) | |
| 37144893 | D35 | P11 | (105685) CNP Seabreeze | 7PSSDB | 20.54 | 6.3 (6.4) | 129.4 (131.46) | |
| 37144738 | D35 | P11 | (113231) COM Public Safety Careers Building | 5PSSDB | 20.53 | 7.5 (7.6) | 153.98 (156.03) | |
| 37144870 | D35 | P11 | (110684) COMC-STREET Reconstruction Projects Cave Run Drive | BS-TON | 20.45 | 4.85 (4.95) | 99.18 (101.23) | |
| 37145011 | D35 | P11 | (112350) LEGACY Drive Offsite Drainage | BS-TON | 20.45 | 6.3 (6.4) | 128.83 (130.88) | |
| 37145080 | D35 | P11 | (112350) LEGACY Drive Offsite Drainage | BS-TON | 20.49 | 6.3 (6.4) | 129.09 (131.14) | |
| 37144990 | D35 | P11 | (114551) LEGACY SEC 6 | 7PSSDB | 20.42 | 5.6 (5.7) | 114.35 (116.39) | |
| 37144940 | D35 | P11 | (114551) LEGACY SEC 6 | 7PSSDB | 20.46 | 5.6 (5.7) | 114.58 (116.62) | |
| 37144762 | D35 | P11 | (84929) Magnolia Park Sec 2 | 5PSSDB | 20.59 | 6.85 (6.95) | 141.04 (143.1) | |
| 37145131 | D35 | P11 | (117805) Meridiana Sec 31B | 5PSSDB | 20.49 | 3.6 (3.7) | 73.76 (75.81) | |
| 37144842 | D35 | P11 | (117805) Meridiana Sec 31B | 5PSSDB | 20.49 | 3.6 (3.7) | 73.76 (75.81) | |
| 37145121 | D35 | P11 | (117805) Meridiana Sec 31B | 5PSSDB | 20.44 | 3.6 (3.7) | 73.58 (75.63) | |
| 37145074 | D35 | P11 | (115947) Mud 57 South Inspiration Way WSD | 5PSSDB | 20.49 | 3.6 (3.7) | 73.76 (75.81) | |
| 37144982 | D35 | P11 | (113657) Pedegral SEC. 4A | 7PSSDB | 20.44 | 5.6 (5.7) | 114.46 (116.51) | |
| 37145113 | D35 | P11 | (77285) TXDOT - SH 288 @ CR. 60 E. DUBUQUE - CN# 0598-02-1 | 7PSSDB | 20.44 | 3.85 (3.95) | 78.69 (80.74) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|