Details

Invoice


CreationDate
02/22/2025
Vehicle
D154 - Driver D154
Work
02-14-2025 to 02-20-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31130401 D154 P6 110625 5PSSDB 15.01 4.1 (4.2) 61.54 (63.04)
31129947 D154 P6 110625 5PSSDB 14.91 4.1 (4.2) 61.13 (62.62)
31130473 D154 P6 114082 7PSSDB 15 4.1 (4.2) 61.5 (63)
31130497 D154 P6 114082 10PSSDA 14.96 4.1 (4.2) 61.34 (62.83)
31130150 D154 P6 114082 10PSSDA 14.9 4.1 (4.2) 61.09 (62.58)
31130248 D154 P6 114082 7PSSDB 15 4.1 (4.2) 61.5 (63)
31130425 D154 P6 (104782) Belmont Estates Section 1 Detention and Drainage 5PSSDB 15.01 5.35 (5.45) 80.3 (81.8)
31130527 D154 P6 (101639) Covington West & Imperial Woods Drainage Project 7PSSDB 15 5.6 (5.7) 84 (85.5)
31130203 D154 P6 (112601) EVERGREEN SEC 4 - WSD&P 5PSSDB 14.99 3.4 (3.5) 50.97 (52.47)
31129963 D154 P6 (115924) Fullbrook on Fulshear Creek Sec 11 10PSSDA 14.98 6.1 (6.2) 91.38 (92.88)
31129911 D154 P6 (115807) Indigo Trails Sec 1 WSD 10PSSDA 14.91 4.45 (4.55) 66.35 (67.84)
31130365 D154 P6 (113970) PACIFIC PEEK LTD 5PSSDB 14.94 5.35 (5.45) 79.93 (81.42)
31130171 D154 P6 (113970) PACIFIC PEEK LTD 5PSSDB 15 5.35 (5.45) 80.25 (81.75)
31130215 D154 P6 (113970) PACIFIC PEEK LTD 5PSSDB 15 5.35 (5.45) 80.25 (81.75)
31130262 D154 P6 (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 412PSCC 15 4.45 (4.55) 66.75 (68.25)
31129882 D154 P6 (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 412PSCC 14.83 4.45 (4.55) 65.99 (67.48)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total