Details

Invoice


CreationDate
02/21/2025
Vehicle
D212 - Neivis Rojas
Work
02-14-2025 to 02-20-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31129991 D212 P6 110625 5PSSDB 17.38 4.1 (4.2) 71.26 (73)
31130534 D212 P6 110819 5PSSDB 17.22 5.35 (5.45) 92.13 (93.85)
31130413 D212 P6 114082 10PSSDA 17.36 4.1 (4.2) 71.18 (72.91)
31130176 D212 P6 114082 10PSSDA 17.32 4.1 (4.2) 71.01 (72.74)
31130129 D212 P6 (111039) Arabella on the Prairie Sec 5 7PSSDB 17.31 3.4 (3.5) 58.85 (60.59)
31130367 D212 P6 (104782) Belmont Estates Section 1 Detention and Drainage 5PSSDB 17.35 5.35 (5.45) 92.82 (94.56)
31130007 D212 P6 (104782) Belmont Estates Section 1 Detention and Drainage 5PSSDB 17.45 5.35 (5.45) 93.36 (95.1)
31129894 D212 P6 (104782) Belmont Estates Section 1 Detention and Drainage 5PSSDB 17.33 5.35 (5.45) 92.72 (94.45)
31130556 D212 P6 (91006) Columbia HS Additions & Renovations 5PSSDB 17.4 7.45 (7.55) 129.63 (131.37)
31130441 D212 P6 (112601) EVERGREEN SEC 4 - WSD&P 5PSSDB 17.3 3.4 (3.5) 58.82 (60.55)
31130576 D212 P6 (114351) FULSHEAR LAKES REC CTR & CREEKSIDE SEC 5 WSD 7PSSDB 17.28 6.1 (6.2) 105.41 (107.14)
31129876 D212 P6 (105749) LCISD CTE Project - ROSENBURG 5PSSDB 17.44 4.45 (4.55) 77.61 (79.35)
31130454 D212 P6 (113970) PACIFIC PEEK LTD 5PSSDB 17.31 5.35 (5.45) 92.61 (94.34)
31129964 D212 P6 (113970) PACIFIC PEEK LTD 5PSSDB 17.4 5.35 (5.45) 93.09 (94.83)
31130480 D212 P6 (115046) TEAMRIDDLE WAY WS&D 5PSSDB 17.33 4.85 (4.95) 84.05 (85.78)
31130198 D212 P6 (115046) TEAMRIDDLE WAY WS&D 5PSSDB 17.33 4.85 (4.95) 84.05 (85.78)
31130261 D212 P6 (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 412PSCC 17.32 4.45 (4.55) 77.07 (78.81)
31129937 D212 P6 (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 412PSCC 17.38 4.45 (4.55) 77.34 (79.08)
31129842 D212 P6 (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 412PSCC 17.48 4.45 (4.55) 77.79 (79.53)
31130143 D212 P6 (96732) TXDOT - WHARTON COUNTY, US 59 7PSSDB 17.31 8.95 (9.05) 154.92 (156.66)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total