Details

Invoice


CreationDate
02/14/2025
Vehicle
D45 - Driver D45
Work
02-07-2025 to 02-13-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
37143992 D45 P11 102040 5PSSDB 20.66 5.6 (5.7) 115.7 (117.76)
37143725 D45 P11 109914 5PSSDB 20.58 5.6 (5.7) 115.25 (117.31)
37143958 D45 P11 113825 5PSSDB 20.72 4.1 (4.2) 84.95 (87.02)
30032989 D45 P5 113825 5PSSDB 20.75 4.1 (4.2) 85.07 (87.15)
37143935 D45 P11 116566 5PSSDB 20.65 3.6 (3.7) 74.34 (76.41)
30033002 D45 P5 116566 5PSSDB 20.66 3.6 (3.7) 74.38 (76.44)
30033094 D45 P5 118395 5PSSDB 20.77 5.6 (5.7) 116.31 (118.39)
37143758 D45 P11 119880 412PSCC 20.61 9.9 (10) 204.04 (206.1)
37143855 D45 P11 83486 7PSSDB 20.67 4.45 (4.55) 91.98 (94.05)
37144182 D45 P11 (100010) Barry Rose WRF phase 1 7PSSDB 20.7 5.05 (5.15) 104.54 (106.61)
37143901 D45 P11 (100010) Barry Rose WRF phase 1 7PSSDB 20.71 5.05 (5.15) 104.59 (106.66)
37144214 D45 P11 (105685) CNP Seabreeze 5PSLSB 20.69 6.3 (6.4) 130.35 (132.42)
37144156 D45 P11 (105685) CNP Seabreeze 5PSLSB 20.71 6.3 (6.4) 130.47 (132.54)
37144132 D45 P11 (105685) CNP Seabreeze 5PSLSB 20.69 6.3 (6.4) 130.35 (132.42)
37143970 D45 P11 (111672) ELLWOOD SEC 1A & KARSTEN BLVD BS-TON 20.69 3.4 (3.5) 70.35 (72.42)
37143820 D45 P11 (113991) Pearland- Roadside Drainage Improvements 7PSSDB 20.73 4.85 (4.95) 100.54 (102.61)
37143843 D45 P11 (77285) TXDOT - SH 288 @ CR. 60 E. DUBUQUE - CN# 0598-02-1 5PSSDB 20.75 3.85 (3.95) 79.89 (81.96)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total