Details

Invoice


CreationDate
02/14/2025
Vehicle
D37 - Driver D37
Work
02-07-2025 to 02-13-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
37143763 D37 P11 110194 5PSSDB 18.33 6.3 (6.4) 115.48 (117.31)
37143793 D37 P11 113825 5PSSDB 18.39 4.1 (4.2) 75.4 (77.24)
37143783 D37 P11 113825 5PSSDB 18.36 4.1 (4.2) 75.28 (77.11)
37144197 D37 P11 116566 5PSSDB 18.41 3.6 (3.7) 66.28 (68.12)
37143747 D37 P11 116566 5PSSDB 16.58 3.6 (3.7) 59.69 (61.35)
37143859 D37 P11 83486 7PSSDB 18.35 4.45 (4.55) 81.66 (83.49)
37143847 D37 P11 (97839) Alexander 3 5PSSDB 18.37 5.05 (5.15) 92.77 (94.61)
37144173 D37 P11 (105685) CNP Seabreeze 5PSLSB 18.44 6.3 (6.4) 116.17 (118.02)
37144153 D37 P11 (105685) CNP Seabreeze 5PSLSB 18.33 6.3 (6.4) 115.48 (117.31)
37144213 D37 P11 (105685) CNP Seabreeze 5PSLSB 18.43 6.3 (6.4) 116.11 (117.95)
37144238 D37 P11 (105685) CNP Seabreeze 5PSLSB 18.37 6.3 (6.4) 115.73 (117.57)
37143856 D37 P11 (111672) ELLWOOD SEC 1A & KARSTEN BLVD 7PSSDB 18.38 3.4 (3.5) 62.49 (64.33)
37144129 D37 P11 (84929) Magnolia Park Sec 2 5PSSDB 18.33 6.85 (6.95) 125.56 (127.39)
37143862 D37 P11 (99370) Olympia Fields Phase 1 Detention & Drainage 5PSSDB 18.36 4.85 (4.95) 89.05 (90.88)
30033101 D37 P5 (113991) Pearland- Roadside Drainage Improvements 7PSSDB 18.5 4.85 (4.95) 89.72 (91.58)
37143827 D37 P11 (113657) Pedegral SEC. 4A 7PSSDB 18.44 5.6 (5.7) 103.26 (105.11)
37143805 D37 P11 (113657) Pedegral SEC. 4A 7PSSDB 18.3 5.6 (5.7) 102.48 (104.31)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total