Details

Invoice


CreationDate
01/24/2025
Vehicle
D210 - Adalberto Andino
Work
01-17-2025 to 01-23-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
72052024 D210 P15 109809 5PSSDB 17.71 3.4 (3.5) 60.21 (61.99)
72052010 D210 P15 (91673) Anderson Road Reconstruction 7PSSDB 17.77 4.1 (4.2) 72.86 (74.63)
72051981 D210 P15 (88319) COH TDO Panel Replace. (Westella) 7PSSDB 17.8 5.35 (5.45) 95.23 (97.01)
72052105 D210 P15 (93517) HPW Arlington Heights Drainage 7PSSDB 17.77 6.3 (6.4) 111.95 (113.73)
72052086 D210 P15 (93517) HPW Arlington Heights Drainage 7PSSDB 17.78 6.3 (6.4) 112.01 (113.79)
72052098 D210 P15 (102436) LOWER KIRBY LATERAL 4 STORM PROJECT 7PSSDB 17.74 4.1 (4.2) 72.73 (74.51)
72052041 D210 P15 (109574) Pearland Industrial 5PSSDB 17.81 5.05 (5.15) 89.94 (91.72)
72052003 D210 P15 (111243) Sienna Oaks Armenity center 7PSSDB 17.75 4.1 (4.2) 72.77 (74.55)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total