Details
Invoice
- CreationDate
- 01/18/2025
- Vehicle
- D12 - Rafael Alvarez
- Work
- 01-10-2025 to 01-16-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 32087868 | D12 | P7 | (114949) 84" WL - HOLLISTER - B1 & B2 water supply | 5PSSDB | 18.12 | 7 (7.1) | 126.84 (128.65) | |
| 32087950 | D12 | P7 | (113672) 96 & 84" WL - GULFBANK & ELLA- | 5PSSDB | 18.02 | 6.85 (6.95) | 123.44 (125.24) | |
| 32087914 | D12 | P7 | (113294) Flagstone Sec 3 WSD&P | 5PSSDB | 18.11 | 5.05 (5.15) | 91.46 (93.27) | |
| 32087929 | D12 | P7 | (113294) Flagstone Sec 3 WSD&P | 5PSSDB | 18.14 | 5.05 (5.15) | 91.61 (93.42) | |
| 32087900 | D12 | P7 | (95596) HC Reconstruction and Widening of Treaschwing Road | 7PSSDB | 17.76 | 4.85 (4.95) | 86.14 (87.91) | |
| 38065286 | D12 | P12 | (115667) HIGHLANDS SEC 17 WSD | 5PSSDB | 18.37 | 4.1 (4.2) | 75.32 (77.15) | |
| 32088100 | D12 | P7 | (115667) HIGHLANDS SEC 17 WSD | 5PSSDB | 18.13 | 3.6 (3.7) | 65.27 (67.08) | |
| 32087987 | D12 | P7 | (118597) HOBAN 24423 HUFSMITH-KOHRVILLE 77375 | 5PSSDB | 18.01 | 7.9 (8) | 142.28 (144.08) | |
| 32088011 | D12 | P7 | (118600) MUD 19 Storm Sewer Rehab | 7PSSDB | 18.05 | 4.3 (4.4) | 77.61 (79.42) | |
| 38065252 | D12 | P12 | (118600) MUD 19 Storm Sewer Rehab | 7PSSDB | 18.4 | 5.85 (5.95) | 107.64 (109.48) | |
| 32088029 | D12 | P7 | (77549) Rd. Recon. W. Gulf Rd | 7PSSDB | 18.15 | 6.1 (6.2) | 110.71 (112.53) | |
| 38065314 | D12 | P12 | (117107) Woodsons Reserve Sec 30 WSDP | 10PSSDA | 18.36 | 5.35 (5.45) | 98.23 (100.06) | |
| 32088083 | D12 | P7 | (117107) Woodsons Reserve Sec 30 WSDP | 10PSSDA | 18.3 | 3.4 (3.5) | 62.22 (64.05) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|