Invoice
- CreationDate
- 01/10/2025
- Vehicle
- D123 - Driver D123
- Work
- 01-03-2025 to 01-09-2025
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 37141726 | D123 | P11 | 102040 | 5PSSDB | 19.38 | 5.6 (5.7) | 108.53 (110.47) | |
| 72051377 | D123 | P15 | 103893 | 7PSSDB | 19.61 | 4.85 (4.95) | 95.11 (97.07) | |
| 72051390 | D123 | P15 | 109809 | 5PSSDB | 19.5 | 3.4 (3.5) | 66.3 (68.25) | |
| 72051470 | D123 | P15 | 116682 | 5PSSDB | 19.68 | 4.45 (4.55) | 87.58 (89.54) | |
| 72051311 | D123 | P15 | 117975 | 10PSSDA | 19.53 | 5.6 (5.7) | 109.37 (111.32) | |
| 72051412 | D123 | P15 | (100440) 6160 South Loop Apartaments | 5PSSDB | 19.63 | 5.6 (5.7) | 109.93 (111.89) | |
| 37141351 | D123 | P11 | 83486 | 7PSSDB | 19.45 | 4.45 (4.55) | 86.55 (88.5) | |
| 72051513 | D123 | P15 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 19.79 | 4.85 (4.95) | 95.98 (97.96) | |
| 72051342 | D123 | P15 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 19.49 | 4.85 (4.95) | 94.53 (96.48) | |
| 72051362 | D123 | P15 | (100010) Barry Rose WRF phase 1 | 7PSSDB | 19.45 | 4.85 (4.95) | 94.33 (96.28) | |
| 37141308 | D123 | P11 | (116658) CNP Oasis Substation | 5PSLSB | 19.43 | 4.3 (4.4) | 83.55 (85.49) | |
| 72051527 | D123 | P15 | (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F | 5PSSDB | 19.76 | 5.6 (5.7) | 110.66 (112.63) | |
| 37141284 | D123 | P11 | (88073) COH - Force Main Flow Diversion - SAGEMONT - 36" F | 5PSSDB | 19.43 | 5.85 (5.95) | 113.67 (115.61) | |
| 72051495 | D123 | P15 | (88319) COH TDO Panel Replace. (Westella) | 7PSSDB | 19.59 | 4.85 (4.95) | 95.01 (96.97) | |
| 72051442 | D123 | P15 | (105094) Gauge Southgate | 5PSSDB | 19.68 | 5.6 (5.7) | 110.21 (112.18) | |
| 72051469 | D123 | P15 | (105094) Gauge Southgate | 5PSSDB | 19.71 | 5.6 (5.7) | 110.38 (112.35) | |
| 72051455 | D123 | P15 | (93517) HPW Arlington Heights Drainage | 7PSSDB | 19.68 | 6.3 (6.4) | 123.98 (125.95) | |
| 72051328 | D123 | P15 | (103555) MD Anderson CSB - Keystone | 7PSSDB | 19.55 | 5.35 (5.45) | 104.59 (106.55) | |
| 72051430 | D123 | P15 | (78716) Richmond Plaza Paving & Drainage | 5PSSDB | 19.79 | 5.35 (5.45) | 105.88 (107.86) | |
| 72051401 | D123 | P15 | (78716) Richmond Plaza Paving & Drainage | 5PSSDB | 19.52 | 5.35 (5.45) | 104.43 (106.38) | |
| 37141326 | D123 | P11 | (115842) SPELLMAN DETENTION BASIN | 10PSSDA | 19.43 | 5.85 (5.95) | 113.67 (115.61) | |
| 37141365 | D123 | P11 | (114154) WINDROSE GREEN SECT 4 | 5PSSDB | 19.44 | 5.85 (5.95) | 113.72 (115.67) |