Details
Invoice
- CreationDate
- 12/28/2024
- Vehicle
- D250 - Jaxiel Jacinto (Level Up Trucking LLC)
- Work
- 12-20-2024 to 12-26-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34168697 | D250 | P8 | 106934 | 5PSCC | 19.04 | 6.1 (6.2) | 116.14 (118.05) | |
| 34168709 | D250 | P8 | 106934 | 5PSCC | 18.87 | 6.1 (6.2) | 115.11 (116.99) | |
| 34168571 | D250 | P8 | (115819) Allen Parkway Village | 7PSSDB | 18.99 | 5.35 (5.45) | 101.6 (103.5) | |
| 34168769 | D250 | P8 | (117823) City of Pasadena - Pasadena Blvd | 7PSSDB | 19.06 | 6.1 (6.2) | 116.27 (118.17) | |
| 34168781 | D250 | P8 | (117823) City of Pasadena - Pasadena Blvd | 7PSSDB | 19.1 | 6.1 (6.2) | 116.51 (118.42) | |
| 34168725 | D250 | P8 | (110336) East Aldine Estates | BS-TON | 19.07 | 4.1 (4.2) | 78.19 (80.09) | |
| 34168623 | D250 | P8 | (111017) Groninger Tank Wash Plant (TAXABLE) | 5PSSDB | 19.02 | 5.35 (5.45) | 101.76 (103.66) | |
| 34168682 | D250 | P8 | (109953) IAH Terminal B | 5PSSDB | 18.98 | 4.85 (4.95) | 92.05 (93.95) | |
| 34168698 | D250 | P8 | (109953) IAH Terminal B | HSBT | 1 | 50 (50) | 50 (50) | |
| 34168597 | D250 | P8 | (114774) Porter Water Well Road | 5PSCC | 19.07 | 5.6 (5.7) | 106.79 (108.7) | |
| 34168642 | D250 | P8 | (114774) Porter Water Well Road | 5PSCC | 18.98 | 5.6 (5.7) | 106.29 (108.19) | |
| 34168664 | D250 | P8 | (114774) Porter Water Well Road | 5PSCC | 18.96 | 5.6 (5.7) | 106.18 (108.07) | |
| 34168744 | D250 | P8 | (83728) Shop/Yard FOB | 7PSSDB | 19.11 | 5.35 (5.45) | 102.24 (104.15) | |
| 34168790 | D250 | P8 | (83953) TIDWELL TIMBERS | 5PSSDB | 19.11 | 3.6 (3.7) | 68.8 (70.71) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|