Details

Invoice


CreationDate
12/20/2024
Vehicle
D44 - Driver D44
Work
12-13-2024 to 12-19-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
72050995 D44 P15 116682 5PSSDB 21.26 4.45 (4.55) 94.61 (96.73)
72050974 D44 P15 117480 7PSSDB 21.31 5.6 (5.7) 119.34 (121.47)
72050689 D44 P15 117569 5PSSDB 21.4 3.6 (3.7) 77.04 (79.18)
37140215 D44 P11 117569 7PSSDB 21.17 4.45 (4.55) 94.21 (96.32)
37140229 D44 P11 117569 10PSSDA 21.14 4.45 (4.55) 94.07 (96.19)
37140265 D44 P11 (100010) Barry Rose WRF phase 1 7PSSDB 21.14 5.05 (5.15) 106.76 (108.87)
37140245 D44 P11 (88319) COH TDO Panel Replace. (Westella) 7PSSDB 21.15 4.85 (4.95) 102.58 (104.69)
72050960 D44 P15 (110684) COMC-STREET Reconstruction Projects Cave Run Drive 7PSSDB 21.28 4.45 (4.55) 94.7 (96.82)
72050950 D44 P15 (109019) Sienna Office Condos / Center 7PSSDB 21.3 4.1 (4.2) 87.33 (89.46)
37140191 D44 P11 (115842) SPELLMAN DETENTION BASIN 10PSSDA 21.2 5.85 (5.95) 124.02 (126.14)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total