Details
Invoice
- CreationDate
- 12/14/2024
- Vehicle
- D12 - Rafael Alvarez
- Work
- 12-06-2024 to 12-12-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 32087087 | D12 | P7 | 106610 | 7PSSDB | 18.29 | 5.35 (5.45) | 97.85 (99.68) | |
| 32087005 | D12 | P7 | 106610 | 7PSSDB | 18.12 | 5.35 (5.45) | 96.94 (98.75) | |
| 32086930 | D12 | P7 | 106610 | 7PSSDB | 18.22 | 5.35 (5.45) | 97.48 (99.3) | |
| 32086969 | D12 | P7 | (114949) 84" WL - HOLLISTER - B1 & B2 water supply | 5PSSDB | 18.24 | 7 (7.1) | 127.68 (129.5) | |
| 32087140 | D12 | P7 | 87383 | 5PSCC | 17.83 | 4.85 (4.95) | 86.48 (88.26) | |
| 32087101 | D12 | P7 | (113672) 96 & 84" WL - GULFBANK & ELLA- | 5PSSDB | 18.19 | 6.85 (6.95) | 124.6 (126.42) | |
| 32086863 | D12 | P7 | (112572) Cypress Park Detention | 10PSSDA | 18.51 | 6.3 (6.4) | 116.61 (118.46) | |
| 32087159 | D12 | P7 | (102368) Excavation of Inwood Forest Detention Basin (Alex) | 5PSSDB | 18.21 | 6.3 (6.4) | 114.72 (116.54) | |
| 32086907 | D12 | P7 | (95596) HC Reconstruction and Widening of Treaschwing Road | 10PSSDA | 18.37 | 4.85 (4.95) | 89.09 (90.93) | |
| 32086890 | D12 | P7 | (111989) MIRROR LAKE CIRCLE PH 4 | 5PSSDB | 18.39 | 3.6 (3.7) | 66.2 (68.04) | |
| 32086880 | D12 | P7 | (111989) MIRROR LAKE CIRCLE PH 4 | 5PSSDB | 18.46 | 3.6 (3.7) | 66.46 (68.3) | |
| 32087019 | D12 | P7 | (99297) Northpointe Boulevard Segment 2 | 7PSSDB | 18.13 | 5.85 (5.95) | 106.06 (107.87) | |
| 32087066 | D12 | P7 | (115626) SJRA Water Plant Nos. 1, 2 & 3 Generators - SPRING | 7PSSDB | 18.15 | 4.85 (4.95) | 88.03 (89.84) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|