Details

Invoice


CreationDate
12/14/2024
Vehicle
D12 - Rafael Alvarez
Work
12-06-2024 to 12-12-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
32087087 D12 P7 106610 7PSSDB 18.29 5.35 (5.45) 97.85 (99.68)
32087005 D12 P7 106610 7PSSDB 18.12 5.35 (5.45) 96.94 (98.75)
32086930 D12 P7 106610 7PSSDB 18.22 5.35 (5.45) 97.48 (99.3)
32086969 D12 P7 (114949) 84" WL - HOLLISTER - B1 & B2 water supply 5PSSDB 18.24 7 (7.1) 127.68 (129.5)
32087140 D12 P7 87383 5PSCC 17.83 4.85 (4.95) 86.48 (88.26)
32087101 D12 P7 (113672) 96 & 84" WL - GULFBANK & ELLA- 5PSSDB 18.19 6.85 (6.95) 124.6 (126.42)
32086863 D12 P7 (112572) Cypress Park Detention 10PSSDA 18.51 6.3 (6.4) 116.61 (118.46)
32087159 D12 P7 (102368) Excavation of Inwood Forest Detention Basin (Alex) 5PSSDB 18.21 6.3 (6.4) 114.72 (116.54)
32086907 D12 P7 (95596) HC Reconstruction and Widening of Treaschwing Road 10PSSDA 18.37 4.85 (4.95) 89.09 (90.93)
32086890 D12 P7 (111989) MIRROR LAKE CIRCLE PH 4 5PSSDB 18.39 3.6 (3.7) 66.2 (68.04)
32086880 D12 P7 (111989) MIRROR LAKE CIRCLE PH 4 5PSSDB 18.46 3.6 (3.7) 66.46 (68.3)
32087019 D12 P7 (99297) Northpointe Boulevard Segment 2 7PSSDB 18.13 5.85 (5.95) 106.06 (107.87)
32087066 D12 P7 (115626) SJRA Water Plant Nos. 1, 2 & 3 Generators - SPRING 7PSSDB 18.15 4.85 (4.95) 88.03 (89.84)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total