Details

Invoice


CreationDate
11/22/2024
Vehicle
D250 - Jaxiel Jacinto (Level Up Trucking LLC)
Work
11-15-2024 to 11-21-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34165061 D250 P8 (71308) (589) MHRA Shepherd Durham 5PSSDB 18.77 5.05 (5.15) 94.79 (96.67)
34165575 D250 P8 113440 10PSSDA 18.76 5.85 (5.95) 109.75 (111.62)
34165358 D250 P8 (115819) Allen Parkway Village 7PSSDB 18.84 5.35 (5.45) 100.79 (102.68)
34165548 D250 P8 (113183) Chestnut Ridge - FY2022 Drainage Rehab (SWAT) Work 5PSSDB 18.78 5.05 (5.15) 94.84 (96.72)
34164974 D250 P8 (110336) East Aldine Estates 7PSSDB 18.81 4.1 (4.2) 77.12 (79)
34164857 D250 P8 (110336) East Aldine Estates 7PSSDB 18.77 4.1 (4.2) 76.96 (78.83)
34165490 D250 P8 (110336) East Aldine Estates 7PSSDB 18.82 4.1 (4.2) 77.16 (79.04)
34165422 D250 P8 (110336) East Aldine Estates 7PSSDB 18.86 4.1 (4.2) 77.33 (79.21)
34165038 D250 P8 (87275) HC Beaumont Place 7PSSDB 18.81 4.3 (4.4) 80.88 (82.76)
34165521 D250 P8 (87275) HC Beaumont Place 7PSSDB 18.79 4.3 (4.4) 80.8 (82.68)
34165020 D250 P8 (109953) IAH Terminal B 5PSSDB 18.84 4.85 (4.95) 91.37 (93.26)
34165005 D250 P8 (84929) Magnolia Park Sec 2 5PSSDB 18.89 5.15 (5.25) 97.28 (99.17)
34165082 D250 P8 (102999) Miller Road 2 Reconstruction from 90 to wallisvill 7PSSDB 18.88 4.45 (4.55) 84.02 (85.9)
34165450 D250 P8 (102722) Pasadena Annual 2024 Paving 7PSSDB 18.91 6.85 (6.95) 129.53 (131.42)
34164922 D250 P8 (107510) Riceland Section 7 5PSSDB 18.85 8.65 (8.75) 163.05 (164.94)
34164886 D250 P8 (106687) UPS Sweetwater 7PSSDB 18.86 5.6 (5.7) 105.62 (107.5)
34165396 D250 P8 (112172) WHCRWA SWSP Segments A1 and A2 -N.LK. HOU. 5PSSDB 18.84 3.6 (3.7) 67.82 (69.71)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total