Details

Invoice


CreationDate
11/08/2024
Vehicle
D209 - Miguel Angel Jaime
Work
11-01-2024 to 11-07-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34163558 D209 P8 (102531) 10700 N Fwy Renovation - Phase III 2024-430 7PSSDB 15.72 4.45 (4.55) 69.95 (71.53)
34163625 D209 P8 (114949) 84" WL - HOLLISTER - B1 & B2 water supply 5PSSDB 15.65 5.85 (5.95) 91.55 (93.12)
71071092 D209 P13 (100010) Barry Rose WRF phase 1 7PSSDB 16.05 5.35 (5.45) 85.87 (87.47)
71071071 D209 P13 (100010) Barry Rose WRF phase 1 7PSSDB 16.12 5.35 (5.45) 86.24 (87.85)
71071050 D209 P13 (100010) Barry Rose WRF phase 1 7PSSDB 16.11 5.35 (5.45) 86.19 (87.8)
71071084 D209 P13 (114910) BEAMER VILLAS PUMP STATION 7PSSDB 16.18 5.05 (5.15) 81.71 (83.33)
71071009 D209 P13 (106542) Coral Haven St Ded 3 - ANGELTON 5PSSDB 16.04 5.6 (5.7) 89.82 (91.43)
34163638 D209 P8 (109953) IAH Terminal B 7PSSDB 15.56 4.85 (4.95) 75.47 (77.02)
34163605 D209 P8 (112574) MB Brickyard 7PSSDB 15.67 8.65 (8.75) 135.55 (137.11)
71071040 D209 P13 (95961) Samara 11 5PSSDB 16.09 5.55 (5.65) 89.3 (90.91)
71071004 D209 P13 (39108) TXDOT Harris Co. SH146 7PSSDB 16.03 8.15 (8.25) 130.64 (132.25)
71071059 D209 P13 (104460) TXDOT Sidewalks 270 and 96 - Main Lane 5PSSDB 16.1 6.35 (6.45) 102.24 (103.85)
71071014 D209 P13 (104460) TXDOT Sidewalks 270 and 96 - Main Lane 5PSSDB 16.03 6.35 (6.45) 101.79 (103.39)
34163582 D209 P8 (112199) WHCRWA SWSP Segment A1 and A2 5PSSDB 15.55 3.6 (3.7) 55.98 (57.54)
34163596 D209 P8 (111505) WHCRWA SWSP Segments A1 and A2 - N.LK.HOU. 5PSSDB 15.55 3.6 (3.7) 55.98 (57.54)
34163612 D209 P8 (87412) Wynnewood Acres Area Drainage and Paving Improveme 5PSSDB 15.68 4.3 (4.4) 67.42 (68.99)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total