Details

Invoice


CreationDate
11/08/2024
Vehicle
D122 - Driver D122
Work
11-01-2024 to 11-07-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
71071068 D122 P13 (100010) Barry Rose WRF phase 1 7PSSDB 22.81 5.35 (5.45) 122.03 (124.31)
71071027 D122 P13 (113228) Coleman Crossing 10PSSDA 22.86 4.8 (4.9) 109.73 (112.01)
71071013 D122 P13 (106570) COM Welding and Industrial Buildings 5PSSDB 22.87 6.35 (6.45) 145.22 (147.51)
71071037 D122 P13 (95961) Samara 11 5PSSDB 22.82 5.55 (5.65) 126.65 (128.93)
71071019 D122 P13 (95961) Samara 11 5PSSDB 22.83 5.55 (5.65) 126.71 (128.99)
71071096 D122 P13 (98170) SAMARA SEC10 & SAMARA WAY 5PSSDB 22.8 5.55 (5.65) 126.54 (128.82)
71071057 D122 P13 (113887) TXDOT - H.CO. FM 1959 (DIXIE FARM) - 1844-01-029 7PSSDB 22.91 5.85 (5.95) 134.02 (136.31)
71071082 D122 P13 (39108) TXDOT Harris Co. SH146 7PSSDB 22.83 8.15 (8.25) 186.06 (188.35)
71071047 D122 P13 (104460) TXDOT Sidewalks 270 and 96 - Main Lane 5PSSDB 22.93 6.35 (6.45) 145.61 (147.9)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total