Details
Invoice
- CreationDate
- 11/01/2024
- Vehicle
- D12 - Rafael Alvarez
- Work
- 10-25-2024 to 10-31-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 32085108 | D12 | P7 | (102368) Excavation of Inwood Forest Detention Basin (Alex) | 10PSSDA | 18.66 | 6.3 (6.4) | 117.56 (119.42) | |
| 32085052 | D12 | P7 | (95596) HC Reconstruction and Widening of Treaschwing Road | 7PSSDB | 18.47 | 4.85 (4.95) | 89.58 (91.43) | |
| 32084941 | D12 | P7 | (95596) HC Reconstruction and Widening of Treaschwing Road | 7PSSDB | 18.6 | 4.85 (4.95) | 90.21 (92.07) | |
| 32084912 | D12 | P7 | (101122) Nabors | 10PSCCA | 18.59 | 6.85 (6.95) | 127.34 (129.2) | |
| 32085000 | D12 | P7 | (103572) Saddle Creek Village | 5PSSDB | 17.95 | 4.85 (4.95) | 87.06 (88.85) | |
| 32085121 | D12 | P7 | (114467) SWIFT @ TOMBALL | 5PSSDB | 18.22 | 5.85 (5.95) | 106.59 (108.41) | |
| 32085015 | D12 | P7 | (60448) Tx Dot 1960 | 7PSSDB | 18.28 | 5.6 (5.7) | 102.37 (104.2) | |
| 32085033 | D12 | P7 | (60448) Tx Dot 1960 | 7PSSDB | 18.17 | 5.6 (5.7) | 101.75 (103.57) | |
| 32084956 | D12 | P7 | (60448) Tx Dot 1960 | 7PSSDB | 18.53 | 5.6 (5.7) | 103.77 (105.62) | |
| 32084978 | D12 | P7 | (90183) TXDOT - HARRIS - FM 1960 - CRT # 1685-01-090 | 7PSSDB | 18.58 | 6.3 (6.4) | 117.05 (118.91) | |
| 32085097 | D12 | P7 | (90183) TXDOT - HARRIS - FM 1960 - CRT # 1685-01-090 | 7PSSDB | 18.07 | 6.3 (6.4) | 113.84 (115.65) | |
| 32085130 | D12 | P7 | (90183) TXDOT - HARRIS - FM 1960 - CRT # 1685-01-090 | 7PSSDB | 18.45 | 6.3 (6.4) | 116.23 (118.08) | |
| 32085067 | D12 | P7 | (110334) Urbana Yardhomes | 7PSSDB | 18.19 | 4.3 (4.4) | 78.22 (80.04) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|