Details

Invoice


CreationDate
11/01/2024
Vehicle
D203 - Aleisy Vernal
Work
10-25-2024 to 10-31-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34163441 D203 P8 (112385) CNP Eastgate Substation 5PSLSB 22.12 6.1 (6.2) 134.93 (137.14)
34163467 D203 P8 (109526) First Industrial Liberty Road BS-TON 22.05 4.1 (4.2) 90.4 (92.61)
34163061 D203 P8 (114836) First Liberty Logistics Center BS-TON 21.79 4.1 (4.2) 89.34 (91.52)
34163341 D203 P8 (111179) HCO Outfall Replacement--Job 772 (Great Glen Dr) 10PSSDA 21.96 6.3 (6.4) 138.35 (140.54)
34163411 D203 P8 (112574) MB Brickyard 7PSSDB 21.98 8.65 (8.75) 190.13 (192.33)
34163283 D203 P8 (102999) Miller Road 2 Reconstruction from 90 to wallisvill 7PSSDB 22.19 4.45 (4.55) 98.75 (100.96)
34163388 D203 P8 (82639) PINE TRAILS DRAINAGE BS-TON 21.99 4.45 (4.55) 97.86 (100.05)
34163249 D203 P8 (102582) Red Bluff Road Drainage Improvements Pasadena 7PSSDB 22 5.85 (5.95) 128.7 (130.9)
34163082 D203 P8 (106368) Riverside Estates Section 1 5PSSDB 21.83 9.15 (9.25) 199.74 (201.93)
34163187 D203 P8 (106368) Riverside Estates Section 1 5PSSDB 22.02 9.15 (9.25) 201.48 (203.69)
34163035 D203 P8 (83953) TIDWELL TIMBERS 5PSSDB 21.99 3.6 (3.7) 79.16 (81.36)
34163217 D203 P8 (114596) UPS Sweetwater 5PSSDB 21.83 5.6 (5.7) 122.25 (124.43)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total