Details
Invoice
- CreationDate
- 11/01/2024
- Vehicle
- D203 - Aleisy Vernal
- Work
- 10-25-2024 to 10-31-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34163441 | D203 | P8 | (112385) CNP Eastgate Substation | 5PSLSB | 22.12 | 6.1 (6.2) | 134.93 (137.14) | |
| 34163467 | D203 | P8 | (109526) First Industrial Liberty Road | BS-TON | 22.05 | 4.1 (4.2) | 90.4 (92.61) | |
| 34163061 | D203 | P8 | (114836) First Liberty Logistics Center | BS-TON | 21.79 | 4.1 (4.2) | 89.34 (91.52) | |
| 34163341 | D203 | P8 | (111179) HCO Outfall Replacement--Job 772 (Great Glen Dr) | 10PSSDA | 21.96 | 6.3 (6.4) | 138.35 (140.54) | |
| 34163411 | D203 | P8 | (112574) MB Brickyard | 7PSSDB | 21.98 | 8.65 (8.75) | 190.13 (192.33) | |
| 34163283 | D203 | P8 | (102999) Miller Road 2 Reconstruction from 90 to wallisvill | 7PSSDB | 22.19 | 4.45 (4.55) | 98.75 (100.96) | |
| 34163388 | D203 | P8 | (82639) PINE TRAILS DRAINAGE | BS-TON | 21.99 | 4.45 (4.55) | 97.86 (100.05) | |
| 34163249 | D203 | P8 | (102582) Red Bluff Road Drainage Improvements Pasadena | 7PSSDB | 22 | 5.85 (5.95) | 128.7 (130.9) | |
| 34163082 | D203 | P8 | (106368) Riverside Estates Section 1 | 5PSSDB | 21.83 | 9.15 (9.25) | 199.74 (201.93) | |
| 34163187 | D203 | P8 | (106368) Riverside Estates Section 1 | 5PSSDB | 22.02 | 9.15 (9.25) | 201.48 (203.69) | |
| 34163035 | D203 | P8 | (83953) TIDWELL TIMBERS | 5PSSDB | 21.99 | 3.6 (3.7) | 79.16 (81.36) | |
| 34163217 | D203 | P8 | (114596) UPS Sweetwater | 5PSSDB | 21.83 | 5.6 (5.7) | 122.25 (124.43) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|