Details

Invoice


CreationDate
08/30/2024
Vehicle
D179 - Alexis Corona Leyva
Work
08-23-2024 to 08-29-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31112005 D179 P6 104418 7PSSDB 21.42 5.1 (5.2) 109.24 (111.38)
31112027 D179 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 21.39 5.35 (5.45) 114.44 (116.58)
31111751 D179 P6 (98154) Austin Point Foundation Way 10PSSDA 21.45 3.85 (3.95) 82.58 (84.73)
31111862 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.45 3.85 (3.95) 82.58 (84.73)
31111824 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.38 3.85 (3.95) 82.31 (84.45)
31112484 D179 P6 (104295) Briarwood Crossing Det 5 & SS 7PSSDB 21.42 3.35 (3.45) 71.76 (73.9)
31112044 D179 P6 (109770) CNP Needville Substation 5PSLSB 21.35 4.6 (4.7) 98.21 (100.35)
31112458 D179 P6 (109770) CNP Needville Substation 5PSLSB 21.45 4.6 (4.7) 98.67 (100.82)
31111727 D179 P6 (107114) Harvest Green 54 5PSSDB 21.39 4.6 (4.7) 98.39 (100.53)
31111837 D179 P6 (107114) Harvest Green 54 7PSSDB 21.4 4.6 (4.7) 98.44 (100.58)
31112508 D179 P6 (107114) Harvest Green 54 7PSSDB 21.42 4.6 (4.7) 98.53 (100.67)
31111774 D179 P6 (96838) Lamar Transportation Center #3 5PSSDB 21.31 3.85 (3.95) 82.04 (84.17)
31111791 D179 P6 (105686) Montclair Blvd Ph II 5PSSDB 21.38 4.8 (4.9) 102.62 (104.76)
31111880 D179 P6 (105686) Montclair Blvd Ph II 5PSSDB 21.36 4.8 (4.9) 102.53 (104.66)
31111901 D179 P6 (84207) Old Needville Fairchild 10PSSDA 21.4 4.05 (4.15) 86.67 (88.81)
31112064 D179 P6 (95317) Wharton US 59 Water and Wastewater Utility Relocat 5PSSDB 21.41 8.15 (8.25) 174.49 (176.63)
31112531 D179 P6 (95317) Wharton US 59 Water and Wastewater Utility Relocat 5PSSDB 21.35 8.15 (8.25) 174 (176.14)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total