Number Vehicle WorkFrom Order Product Ton Price Total
31110003 D206 P6 104418 7PSSDB 15.17 5.1 (5.2) 77.37 (78.88)
31109866 D206 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 15.26 5.85 (5.95) 89.27 (90.8)
31110445 D206 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 15.2 5.35 (5.45) 81.32 (82.84)
31110038 D206 P6 (98154) Austin Point Foundation Way 5PSSDB 15.3 3.85 (3.95) 58.9 (60.44)
31110425 D206 P6 (98154) Austin Point Foundation Way 10PSSDA 15.19 3.85 (3.95) 58.48 (60)
31109951 D206 P6 (98154) Austin Point Foundation Way 5PSSDB 15.28 3.85 (3.95) 58.83 (60.36)
31109936 D206 P6 (91923) Candela South 1,2,3,4 7PSSDB 15.23 5.1 (5.2) 77.67 (79.2)
31109917 D206 P6 (88826) Clay/2nd St Sidewalk & Drainage Imprv 10PSSDA 15.29 3.85 (3.95) 58.87 (60.4)
31109878 D206 P6 (88826) Clay/2nd St Sidewalk & Drainage Imprv 10PSSDA 15.27 3.85 (3.95) 58.79 (60.32)
31110542 D206 P6 (88826) Clay/2nd St Sidewalk & Drainage Imprv 10PSSDA 15.25 3.85 (3.95) 58.71 (60.24)
31110355 D206 P6 (107335) CNP Waterhole Substation 5PSLSB 15.34 9.15 (9.25) 140.36 (141.9)
31110589 D206 P6 (105600) Cross Creek West Sec 8 7PSSDB 15.2 5.85 (5.95) 88.92 (90.44)
31109960 D206 P6 (109948) CROWNED HERON BESS 7PSSDB 15.24 4.6 (4.7) 70.1 (71.63)
31109832 D206 P6 (103346) ESPERANZA SEC ONE 5PSSDB 15.36 3.35 (3.45) 51.46 (52.99)
31110469 D206 P6 (103346) ESPERANZA SEC ONE 5PSSDB 15.19 3.35 (3.45) 50.89 (52.41)
31110106 D206 P6 (100922) Fulshear Lakes Hillside Sec 1 5PSSDB 15.23 6.6 (6.7) 100.52 (102.04)
31110058 D206 P6 (100922) Fulshear Lakes Hillside Sec 1 5PSSDB 15.23 6.6 (6.7) 100.52 (102.04)
31110630 D206 P6 (107114) Harvest Green 54 7PSSDB 15.26 4.6 (4.7) 70.2 (71.72)
31109752 D206 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 15.27 4.2 (4.3) 64.13 (65.66)
31110409 D206 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 15.21 4.2 (4.3) 63.88 (65.4)
31110095 D206 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 15.26 4.2 (4.3) 64.09 (65.62)
31110561 D206 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 15.18 4.2 (4.3) 63.76 (65.27)
31109929 D206 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 15.21 4.2 (4.3) 63.88 (65.4)
31109974 D206 P6 (94901) ILT Richmond K-8 10PSSDA 15.27 4.05 (4.15) 61.84 (63.37)
31110014 D206 P6 (94901) ILT Richmond K-8 10PSSDA 15.28 4.05 (4.15) 61.88 (63.41)
31109850 D206 P6 (96838) Lamar Transportation Center #3 5PSSDB 15.22 3.85 (3.95) 58.6 (60.12)
31110139 D206 P6 (102121) Pecan Knoll Drive Phase III 7PSSDB 15.27 5.6 (5.7) 85.51 (87.04)
31110389 D206 P6 (102832) SH36 NORTH @ Spur 10- 5PSSDB 15.25 3.23 (3.33) 49.26 (50.78)
31110624 D206 P6 (102832) SH36 NORTH @ Spur 10- 5PSSDB 15.23 3.23 (3.33) 49.19 (50.72)
31110480 D206 P6 (95317) Wharton US 59 Water and Wastewater Utility Relocat 5PSSDB 15.18 8.15 (8.25) 123.72 (125.24)