Details
Invoice
- CreationDate
- 08/17/2024
- Vehicle
- D206 - Grydslay Figueredo
- Work
- 08-09-2024 to 08-15-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 31110003 | D206 | P6 | 104418 | 7PSSDB | 15.17 | 5.1 (5.2) | 77.37 (78.88) | |
| 31109866 | D206 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 15.26 | 5.85 (5.95) | 89.27 (90.8) | |
| 31110445 | D206 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 15.2 | 5.35 (5.45) | 81.32 (82.84) | |
| 31110038 | D206 | P6 | (98154) Austin Point Foundation Way | 5PSSDB | 15.3 | 3.85 (3.95) | 58.9 (60.44) | |
| 31110425 | D206 | P6 | (98154) Austin Point Foundation Way | 10PSSDA | 15.19 | 3.85 (3.95) | 58.48 (60) | |
| 31109951 | D206 | P6 | (98154) Austin Point Foundation Way | 5PSSDB | 15.28 | 3.85 (3.95) | 58.83 (60.36) | |
| 31109936 | D206 | P6 | (91923) Candela South 1,2,3,4 | 7PSSDB | 15.23 | 5.1 (5.2) | 77.67 (79.2) | |
| 31109917 | D206 | P6 | (88826) Clay/2nd St Sidewalk & Drainage Imprv | 10PSSDA | 15.29 | 3.85 (3.95) | 58.87 (60.4) | |
| 31109878 | D206 | P6 | (88826) Clay/2nd St Sidewalk & Drainage Imprv | 10PSSDA | 15.27 | 3.85 (3.95) | 58.79 (60.32) | |
| 31110542 | D206 | P6 | (88826) Clay/2nd St Sidewalk & Drainage Imprv | 10PSSDA | 15.25 | 3.85 (3.95) | 58.71 (60.24) | |
| 31110355 | D206 | P6 | (107335) CNP Waterhole Substation | 5PSLSB | 15.34 | 9.15 (9.25) | 140.36 (141.9) | |
| 31110589 | D206 | P6 | (105600) Cross Creek West Sec 8 | 7PSSDB | 15.2 | 5.85 (5.95) | 88.92 (90.44) | |
| 31109960 | D206 | P6 | (109948) CROWNED HERON BESS | 7PSSDB | 15.24 | 4.6 (4.7) | 70.1 (71.63) | |
| 31109832 | D206 | P6 | (103346) ESPERANZA SEC ONE | 5PSSDB | 15.36 | 3.35 (3.45) | 51.46 (52.99) | |
| 31110469 | D206 | P6 | (103346) ESPERANZA SEC ONE | 5PSSDB | 15.19 | 3.35 (3.45) | 50.89 (52.41) | |
| 31110106 | D206 | P6 | (100922) Fulshear Lakes Hillside Sec 1 | 5PSSDB | 15.23 | 6.6 (6.7) | 100.52 (102.04) | |
| 31110058 | D206 | P6 | (100922) Fulshear Lakes Hillside Sec 1 | 5PSSDB | 15.23 | 6.6 (6.7) | 100.52 (102.04) | |
| 31110630 | D206 | P6 | (107114) Harvest Green 54 | 7PSSDB | 15.26 | 4.6 (4.7) | 70.2 (71.72) | |
| 31109752 | D206 | P6 | (107475) HARVEST POINTE SEC 1 | 7PSSDB | 15.27 | 4.2 (4.3) | 64.13 (65.66) | |
| 31110409 | D206 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 15.21 | 4.2 (4.3) | 63.88 (65.4) | |
| 31110095 | D206 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 15.26 | 4.2 (4.3) | 64.09 (65.62) | |
| 31110561 | D206 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 15.18 | 4.2 (4.3) | 63.76 (65.27) | |
| 31109929 | D206 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 15.21 | 4.2 (4.3) | 63.88 (65.4) | |
| 31109974 | D206 | P6 | (94901) ILT Richmond K-8 | 10PSSDA | 15.27 | 4.05 (4.15) | 61.84 (63.37) | |
| 31110014 | D206 | P6 | (94901) ILT Richmond K-8 | 10PSSDA | 15.28 | 4.05 (4.15) | 61.88 (63.41) | |
| 31109850 | D206 | P6 | (96838) Lamar Transportation Center #3 | 5PSSDB | 15.22 | 3.85 (3.95) | 58.6 (60.12) | |
| 31110139 | D206 | P6 | (102121) Pecan Knoll Drive Phase III | 7PSSDB | 15.27 | 5.6 (5.7) | 85.51 (87.04) | |
| 31110389 | D206 | P6 | (102832) SH36 NORTH @ Spur 10- | 5PSSDB | 15.25 | 3.23 (3.33) | 49.26 (50.78) | |
| 31110624 | D206 | P6 | (102832) SH36 NORTH @ Spur 10- | 5PSSDB | 15.23 | 3.23 (3.33) | 49.19 (50.72) | |
| 31110480 | D206 | P6 | (95317) Wharton US 59 Water and Wastewater Utility Relocat | 5PSSDB | 15.18 | 8.15 (8.25) | 123.72 (125.24) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|