Details

Invoice


CreationDate
08/02/2024
Vehicle
D179 - Alexis Corona Leyva
Work
07-26-2024 to 08-01-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31108245 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.37 3.85 (3.95) 82.27 (84.41)
31108204 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.4 3.85 (3.95) 82.39 (84.53)
31108130 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.4 3.85 (3.95) 82.39 (84.53)
31108120 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.42 3.85 (3.95) 82.47 (84.61)
31108107 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.41 3.85 (3.95) 82.43 (84.57)
31108150 D179 P6 (98154) Austin Point Foundation Way 5PSSDB 21.37 3.85 (3.95) 82.27 (84.41)
31108295 D179 P6 (107335) CNP Waterhole Substation 5PSLSB 21.39 9.15 (9.25) 195.72 (197.86)
31108087 D179 P6 (107335) CNP Waterhole Substation 5PSLSB 21.43 9.15 (9.25) 196.08 (198.23)
31108169 D179 P6 (88319) COH TDO Panel Replace. (Westella) 7PSSDB 21.39 5.85 (5.95) 125.13 (127.27)
31108222 D179 P6 (95303) McCray Rd Reconstruction & Widening 7PSSDB 21.48 4.6 (4.7) 98.81 (100.96)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total