Details

Invoice


CreationDate
07/27/2024
Vehicle
D154 - Driver D154
Work
07-19-2024 to 07-25-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31108041 D154 P6 101578 5PSSDB 17.73 5.1 (5.2) 90.42 (92.2)
31107776 D154 P6 (98154) Austin Point Foundation Way 10PSSDA 17.76 3.85 (3.95) 68.38 (70.15)
31107794 D154 P6 (98154) Austin Point Foundation Way 10PSSDA 17.74 3.85 (3.95) 68.3 (70.07)
31107999 D154 P6 (98154) Austin Point Foundation Way 5PSSDB 17.68 3.85 (3.95) 68.07 (69.84)
31107597 D154 P6 (98154) Austin Point Foundation Way 5PSSDB 17.78 3.85 (3.95) 68.45 (70.23)
31107545 D154 P6 (98154) Austin Point Foundation Way 10PSSDA 17.71 3.85 (3.95) 68.18 (69.95)
31107620 D154 P6 (98154) Austin Point Foundation Way 10PSSDA 17.78 3.85 (3.95) 68.45 (70.23)
31107514 D154 P6 (88826) Clay/2nd St Sidewalk & Drainage Imprv 10PSSDA 17.76 3.85 (3.95) 68.38 (70.15)
31107724 D154 P6 (107335) CNP Waterhole Substation 5PSLSB 17.84 9.15 (9.25) 163.24 (165.02)
31107864 D154 P6 (105600) Cross Creek West Sec 8 7PSSDB 17.77 5.85 (5.95) 103.95 (105.73)
31108070 D154 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 17.7 4.2 (4.3) 74.34 (76.11)
31107905 D154 P6 (95303) McCray Rd Reconstruction & Widening 7PSSDB 17.73 4.6 (4.7) 81.56 (83.33)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total