Details

Invoice


CreationDate
07/26/2024
Vehicle
D152 - Driver D152
Work
07-19-2024 to 07-25-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31107853 D152 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 18.9 5.35 (5.45) 101.11 (103.01)
31108039 D152 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 18.99 5.35 (5.45) 101.6 (103.5)
31107505 D152 P6 (98154) Austin Point Foundation Way 5PSSDB 18.93 3.85 (3.95) 72.88 (74.77)
31107558 D152 P6 (98154) Austin Point Foundation Way 10PSSDA 18.88 3.85 (3.95) 72.69 (74.58)
31107947 D152 P6 (98154) Austin Point Foundation Way 10PSSDA 18.97 3.85 (3.95) 73.03 (74.93)
31107881 D152 P6 (98154) Austin Point Foundation Way 10PSSDA 18.91 3.85 (3.95) 72.8 (74.69)
31107997 D152 P6 (98154) Austin Point Foundation Way 5PSSDB 18.93 3.85 (3.95) 72.88 (74.77)
31108069 D152 P6 (98154) Austin Point Foundation Way 10PSSDA 18.98 3.85 (3.95) 73.07 (74.97)
31107520 D152 P6 (88826) Clay/2nd St Sidewalk & Drainage Imprv 10PSSDA 18.93 3.85 (3.95) 72.88 (74.77)
31107581 D152 P6 (105786) CROWNED HERON BESS 7PSSDB 18.92 4.6 (4.7) 87.03 (88.92)
31107965 D152 P6 (103346) ESPERANZA SEC ONE 5PSSDB 18.9 3.35 (3.45) 63.32 (65.21)
31108020 D152 P6 (103346) ESPERANZA SEC ONE 5PSSDB 18.98 3.35 (3.45) 63.58 (65.48)
31107634 D152 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 18.96 4.2 (4.3) 79.63 (81.53)
31107834 D152 P6 (96838) Lamar Transportation Center #3 5PSSDB 18.92 3.85 (3.95) 72.84 (74.73)
31107898 D152 P6 (95303) McCray Rd Reconstruction & Widening 10PSSDA 18.94 4.6 (4.7) 87.12 (89.02)
31107613 D152 P6 (105686) Montclair Blvd Ph II 5PSSDB 18.89 4.8 (4.9) 90.67 (92.56)
31107922 D152 P6 (105686) Montclair Blvd Ph II 5PSSDB 18.91 4.8 (4.9) 90.77 (92.66)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total