Details
Invoice
- CreationDate
- 07/26/2024
- Vehicle
- D133 - Driver D133
- Work
- 07-19-2024 to 07-25-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 31107717 | D133 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 19.92 | 5.35 (5.45) | 106.57 (108.56) | |
| 31107504 | D133 | P6 | (98154) Austin Point Foundation Way | 5PSSDB | 19.9 | 3.85 (3.95) | 76.61 (78.61) | |
| 31107552 | D133 | P6 | (98154) Austin Point Foundation Way | 10PSSDA | 19.89 | 3.85 (3.95) | 76.58 (78.57) | |
| 31107700 | D133 | P6 | (98154) Austin Point Foundation Way | 5PSSDB | 19.89 | 3.85 (3.95) | 76.58 (78.57) | |
| 31107522 | D133 | P6 | (88826) Clay/2nd St Sidewalk & Drainage Imprv | 10PSSDA | 19.89 | 3.85 (3.95) | 76.58 (78.57) | |
| 31107765 | D133 | P6 | (105600) Cross Creek West Sec 8 | 7PSSDB | 19.87 | 5.85 (5.95) | 116.24 (118.23) | |
| 31107577 | D133 | P6 | (105786) CROWNED HERON BESS | 7PSSDB | 19.9 | 4.6 (4.7) | 91.54 (93.53) | |
| 31107633 | D133 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 19.88 | 4.2 (4.3) | 83.5 (85.48) | |
| 31107651 | D133 | P6 | (96838) Lamar Transportation Center #3 | 5PSSDB | 19.98 | 3.85 (3.95) | 76.92 (78.92) | |
| 31107612 | D133 | P6 | (109263) OAK LOFTS CROSSING | 5PSSDB | 19.93 | 5.1 (5.2) | 101.64 (103.64) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|