Details

Invoice


CreationDate
07/19/2024
Vehicle
D154 - Driver D154
Work
07-12-2024 TO 07-18-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31107195 D154 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 17.65 5.35 (5.45) 94.43 (96.19)
31107427 D154 P6 (98154) Austin Point Foundation Way 10PSSDA 17.74 3.85 (3.95) 68.3 (70.07)
31107175 D154 P6 (98154) Austin Point Foundation Way 5PSSDB 17.72 3.85 (3.95) 68.22 (69.99)
31106873 D154 P6 (105600) Cross Creek West Sec 8 7PSSDB 17.06 5.85 (5.95) 99.8 (101.51)
31107448 D154 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 17.76 4.2 (4.3) 74.59 (76.37)
31106912 D154 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 17.06 4.2 (4.3) 71.65 (73.36)
31107309 D154 P6 (96838) Lamar Transportation Center #3 5PSSDB 17.73 3.85 (3.95) 68.26 (70.03)
31107467 D154 P6 (96838) Lamar Transportation Center #3 5PSSDB 17.77 3.85 (3.95) 68.41 (70.19)
31107327 D154 P6 (95303) McCray Rd Reconstruction & Widening 10PSSDA 17.84 4.6 (4.7) 82.06 (83.85)
31106960 D154 P6 (109263) OAK LOFTS CROSSING 5PSSDB 17.01 5.1 (5.2) 86.75 (88.45)
31107376 D154 P6 (109263) OAK LOFTS CROSSING 5PSSDB 17.81 5.1 (5.2) 90.83 (92.61)
31107274 D154 P6 (102121) Pecan Knoll Drive Phase III 7PSSDB 17.74 5.6 (5.7) 99.34 (101.12)
31106930 D154 P6 (102122) Pecan Ridge Sec 9 5PSSDB 17.06 5.6 (5.7) 95.54 (97.24)
31107410 D154 P6 (102832) SH36 NORTH @ Spur 10- 5PSSDB 17.78 3.23 (3.33) 57.43 (59.21)
31107253 D154 P6 (102832) SH36 NORTH @ Spur 10- 5PSSDB 17.75 3.23 (3.33) 57.33 (59.11)
31107235 D154 P6 (102832) SH36 NORTH @ Spur 10- 5PSSDB 17.71 3.23 (3.33) 57.2 (58.97)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total