Details

Invoice


CreationDate
07/12/2024
Vehicle
D179 - Alexis Corona Leyva
Work
07-05-2024 to 07-11-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31106689 D179 P6 101578 5PSSDB 21.45 5.1 (5.2) 109.39 (111.54)
31106609 D179 P6 (103560) AUSTIN POINT 5PSSDB 21.38 3.85 (3.95) 82.31 (84.45)
31106709 D179 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 21.38 4.2 (4.3) 89.8 (91.93)
31106731 D179 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.41 4.2 (4.3) 89.92 (92.06)
31106644 D179 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 21.41 4.2 (4.3) 89.92 (92.06)
31106632 D179 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.33 4.2 (4.3) 89.59 (91.72)
31106578 D179 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.4 4.2 (4.3) 89.88 (92.02)
31106654 D179 P6 (102121) Pecan Knoll Drive Phase III 7PSSDB 21.31 5.6 (5.7) 119.34 (121.47)
31106741 D179 P6 (102122) Pecan Ridge Sec 9 7PSSDB 21.16 5.6 (5.7) 118.5 (120.61)
31106589 D179 P6 (107211) Tamarron PH X Det and Grading 5PSSDB 21.36 5.6 (5.7) 119.62 (121.75)
31106619 D179 P6 (107211) Tamarron PH X Det and Grading 5PSSDB 21.33 5.6 (5.7) 119.45 (121.58)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total