Details
Invoice
- CreationDate
- 07/12/2024
- Vehicle
- D123 - Driver D123
- Work
- 07-05-2024 to 07-11-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 31106611 | D123 | P6 | 101578 | 5PSSDB | 21.06 | 5.1 (5.2) | 107.41 (109.51) | |
| 31106705 | D123 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 21.02 | 5.85 (5.95) | 122.97 (125.07) | |
| 31106626 | D123 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 21.01 | 4.2 (4.3) | 88.24 (90.34) | |
| 31106648 | D123 | P6 | (107475) HARVEST POINTE SEC 1 | 7PSSDB | 21 | 4.2 (4.3) | 88.2 (90.3) | |
| 31106577 | D123 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 21.02 | 4.2 (4.3) | 88.28 (90.39) | |
| 31106605 | D123 | P6 | (107475) HARVEST POINTE SEC 1 | 7PSSDB | 20.99 | 4.2 (4.3) | 88.16 (90.26) | |
| 31106682 | D123 | P6 | (107475) HARVEST POINTE SEC 1 | 5PSSDB | 21.06 | 4.2 (4.3) | 88.45 (90.56) | |
| 31106700 | D123 | P6 | (96838) Lamar Transportation Center #3 | 5PSSDB | 21.05 | 3.85 (3.95) | 81.04 (83.15) | |
| 31106588 | D123 | P6 | (107211) Tamarron PH X Det and Grading | 5PSSDB | 20.99 | 5.6 (5.7) | 117.54 (119.64) | |
| 31106631 | D123 | P6 | (107211) Tamarron PH X Det and Grading | 5PSSDB | 20.98 | 5.6 (5.7) | 117.49 (119.59) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|