Details

Invoice


CreationDate
07/12/2024
Vehicle
D123 - Driver D123
Work
07-05-2024 to 07-11-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31106611 D123 P6 101578 5PSSDB 21.06 5.1 (5.2) 107.41 (109.51)
31106705 D123 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 21.02 5.85 (5.95) 122.97 (125.07)
31106626 D123 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.01 4.2 (4.3) 88.24 (90.34)
31106648 D123 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 21 4.2 (4.3) 88.2 (90.3)
31106577 D123 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.02 4.2 (4.3) 88.28 (90.39)
31106605 D123 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 20.99 4.2 (4.3) 88.16 (90.26)
31106682 D123 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 21.06 4.2 (4.3) 88.45 (90.56)
31106700 D123 P6 (96838) Lamar Transportation Center #3 5PSSDB 21.05 3.85 (3.95) 81.04 (83.15)
31106588 D123 P6 (107211) Tamarron PH X Det and Grading 5PSSDB 20.99 5.6 (5.7) 117.54 (119.64)
31106631 D123 P6 (107211) Tamarron PH X Det and Grading 5PSSDB 20.98 5.6 (5.7) 117.49 (119.59)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total