Details

Invoice


CreationDate
07/05/2024
Vehicle
D213 - Osmel Prats Falcon
Work
06-28-2024 TO 07-04-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31106244 D213 P6 101578 5PSSDB 16.37 5.1 (5.2) 83.49 (85.12)
31106408 D213 P6 101578 5PSSDB 16.5 5.1 (5.2) 84.15 (85.8)
31106298 D213 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 16.31 5.35 (5.45) 87.26 (88.89)
31106191 D213 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 16.35 5.85 (5.95) 95.65 (97.28)
31106277 D213 P6 (104427) BRIARWOOD CROSSING SEC 13 WS&D 5PSSDB 16.37 3.85 (3.95) 63.02 (64.66)
31106210 D213 P6 (104427) BRIARWOOD CROSSING SEC 13 WS&D 5PSSDB 16.5 3.85 (3.95) 63.52 (65.18)
31106084 D213 P6 (104427) BRIARWOOD CROSSING SEC 13 WS&D 5PSSDB 16.38 3.85 (3.95) 63.06 (64.7)
31106096 D213 P6 (87126) Harvest Home Drive St Ded 4 7PSSDB 16.39 4.6 (4.7) 75.39 (77.03)
31106317 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.36 4.2 (4.3) 68.71 (70.35)
31106220 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.36 4.2 (4.3) 68.71 (70.35)
31106173 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.41 4.2 (4.3) 68.92 (70.56)
31106133 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.35 4.2 (4.3) 68.67 (70.31)
31106121 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.42 4.2 (4.3) 68.96 (70.61)
31106394 D213 P6 (107475) HARVEST POINTE SEC 1 5PSSDB 16.4 4.2 (4.3) 68.88 (70.52)
31106263 D213 P6 (96838) Lamar Transportation Center #3 5PSSDB 16.37 3.85 (3.95) 63.02 (64.66)
31106353 D213 P6 (92756) Millers Pond Sec 3 10PSSDA 16.49 3.85 (3.95) 63.49 (65.14)
31106366 D213 P6 (96732) TXDOT - WHARTON COUNTY, US 59 7PSSDB 16.31 8.7 (8.8) 141.9 (143.53)
31106059 D213 P6 (96732) TXDOT - WHARTON COUNTY, US 59 7PSSDB 16.26 8.7 (8.8) 141.46 (143.09)
31106335 D213 P6 (97389) Wallingford Park Dr PH 3 WSD&P 10PSSDA 16.38 4.6 (4.7) 75.35 (76.99)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total