Details

Invoice


CreationDate
08/12/2023
Vehicle
D167 - Jose Zayas
Work
08-04-2023 TO 08-10-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34117428 D167 P8 (90248) BLALOCK - FY 2023 Roadway Rehab Project # 2 10PSCCA 18.33 5.85 (5.95) 107.23 (109.06)
34117551 D167 P8 (25434) Garden Oaks & shepherd Park West Drainage 5PSSDB 18.17 4.8 (4.9) 87.22 (89.03)
34117567 D167 P8 (25434) Garden Oaks & shepherd Park West Drainage 5PSSDB 18.14 4.8 (4.9) 87.07 (88.89)
34117677 D167 P8 (80761) NHH BERRY - new hope housing 7PSSDB 18.14 4.05 (4.15) 73.47 (75.28)
34117183 D167 P8 (16357) Northline Drainage & Paving 5PSSDB 18.1 3.95 (4.05) 71.5 (73.31)
34117720 D167 P8 (84516) Riceland 3 5PSSDB 18.21 8.4 (8.5) 152.96 (154.79)
34117731 D167 P8 (84516) Riceland 3 5PSSDB 18.2 8.4 (8.5) 152.88 (154.7)
34117292 D167 P8 (78336) Riceland Sec 1 5PSSDB 18.14 8.4 (8.5) 152.38 (154.19)
34117089 D167 P8 (78336) Riceland Sec 1 5PSSDB 18.18 8.4 (8.5) 152.71 (154.53)
34117823 D167 P8 (73335) San Augustine 7PSSDB 18.17 5.85 (5.95) 106.29 (108.11)
34117117 D167 P8 (83445) TXDOT - UA 90 WAYSIDE - CONTR # 0027-10-075 7PSSDB 18.2 4.6 (4.7) 83.72 (85.54)
34117529 D167 P8 (83445) TXDOT - UA 90 WAYSIDE - CONTR # 0027-10-075 7PSSDB 18.2 4.6 (4.7) 83.72 (85.54)
34117756 D167 P8 (87865) Winzer park Drainage Improv - DOLLY WRIGHT 5PSSDB 18.24 4.1 (4.2) 74.78 (76.61)
34117319 D167 P8 (87977) Winzer park Drainage Improv -WALCOTT LANE/FY2023 L 5PSSDB 18.19 4.1 (4.2) 74.58 (76.4)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total