Details
Invoice
- CreationDate
- 08/12/2023
- Vehicle
- D167 - Jose Zayas
- Work
- 08-04-2023 TO 08-10-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34117428 | D167 | P8 | (90248) BLALOCK - FY 2023 Roadway Rehab Project # 2 | 10PSCCA | 18.33 | 5.85 (5.95) | 107.23 (109.06) | |
| 34117551 | D167 | P8 | (25434) Garden Oaks & shepherd Park West Drainage | 5PSSDB | 18.17 | 4.8 (4.9) | 87.22 (89.03) | |
| 34117567 | D167 | P8 | (25434) Garden Oaks & shepherd Park West Drainage | 5PSSDB | 18.14 | 4.8 (4.9) | 87.07 (88.89) | |
| 34117677 | D167 | P8 | (80761) NHH BERRY - new hope housing | 7PSSDB | 18.14 | 4.05 (4.15) | 73.47 (75.28) | |
| 34117183 | D167 | P8 | (16357) Northline Drainage & Paving | 5PSSDB | 18.1 | 3.95 (4.05) | 71.5 (73.31) | |
| 34117720 | D167 | P8 | (84516) Riceland 3 | 5PSSDB | 18.21 | 8.4 (8.5) | 152.96 (154.79) | |
| 34117731 | D167 | P8 | (84516) Riceland 3 | 5PSSDB | 18.2 | 8.4 (8.5) | 152.88 (154.7) | |
| 34117292 | D167 | P8 | (78336) Riceland Sec 1 | 5PSSDB | 18.14 | 8.4 (8.5) | 152.38 (154.19) | |
| 34117089 | D167 | P8 | (78336) Riceland Sec 1 | 5PSSDB | 18.18 | 8.4 (8.5) | 152.71 (154.53) | |
| 34117823 | D167 | P8 | (73335) San Augustine | 7PSSDB | 18.17 | 5.85 (5.95) | 106.29 (108.11) | |
| 34117117 | D167 | P8 | (83445) TXDOT - UA 90 WAYSIDE - CONTR # 0027-10-075 | 7PSSDB | 18.2 | 4.6 (4.7) | 83.72 (85.54) | |
| 34117529 | D167 | P8 | (83445) TXDOT - UA 90 WAYSIDE - CONTR # 0027-10-075 | 7PSSDB | 18.2 | 4.6 (4.7) | 83.72 (85.54) | |
| 34117756 | D167 | P8 | (87865) Winzer park Drainage Improv - DOLLY WRIGHT | 5PSSDB | 18.24 | 4.1 (4.2) | 74.78 (76.61) | |
| 34117319 | D167 | P8 | (87977) Winzer park Drainage Improv -WALCOTT LANE/FY2023 L | 5PSSDB | 18.19 | 4.1 (4.2) | 74.58 (76.4) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|