Details

Invoice


CreationDate
06/14/2024
Vehicle
D213 - Osmel Prats Falcon
Work
06-07-2024 to 06-13-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
31104415 D213 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 16.35 5.95 (5.95) 97.28 (97.28)
31104376 D213 P6 (106286) 717 const - B22-100 Term Contract for Concrete Pav 7PSSDB 16.32 5.95 (5.95) 97.1 (97.1)
31103828 D213 P6 (103560) AUSTIN POINT 16.63 3.95 (3.95) 65.69 (0)
31104704 D213 P6 (103250) Blue Wave Express Carwash 7PSSDB 16.5 3.95 (3.95) 65.18 (65.18)
31104715 D213 P6 (96908) Esperanza Ph 1 Det 5PSSDB 16.42 3.95 (3.95) 64.86 (64.86)
31104348 D213 P6 (107961) ETC Trunkline 7PSSDB 16.34 6.85 (6.85) 111.93 (111.93)
31104433 D213 P6 (92605) Evergreen 2 WSD 5PSSDB 16.4 3.1 (3.1) 50.84 (50.84)
31104426 D213 P6 (92605) Evergreen 2 WSD 5PSSDB 16.16 3.1 (3.1) 50.1 (50.1)
31104340 D213 P6 (92605) Evergreen 2 WSD 5PSSDB 16.3 3.1 (3.1) 50.53 (50.53)
31104685 D213 P6 (107475) HARVEST POINTE SEC 1 7PSSDB 16.43 4.3 (4.3) 70.65 (70.65)
31104641 D213 P6 (95518) KINGDOM HEIGHT SEC 8 5PSSDB 16.5 4.15 (4.15) 68.48 (68.48)
31104442 D213 P6 (95518) KINGDOM HEIGHT SEC 8 10PSSDA 16.25 4.15 (4.15) 67.44 (67.44)
31104658 D213 P6 (95303) McCray Rd Reconstruction & Widening 10PSSDA 16.44 4.7 (4.7) 77.27 (77.27)
31104776 D213 P6 (97389) Wallingford Park Dr PH 3 WSD&P 5PSSDB 16.49 4.7 (4.7) 77.5 (77.5)
31104739 D213 P6 (97389) Wallingford Park Dr PH 3 WSD&P 5PSSDB 16.4 4.7 (4.7) 77.08 (77.08)
31104330 D213 P6 (97389) Wallingford Park Dr PH 3 WSD&P 5PSSDB 16.28 4.7 (4.7) 76.52 (76.52)
31104759 D213 P6 (97389) Wallingford Park Dr PH 3 WSD&P 5PSSDB 16.42 4.7 (4.7) 77.17 (77.17)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total