Details
Invoice
- CreationDate
- 05/25/2024
- Vehicle
- D213 - Osmel Prats Falcon
- Work
- 05-17-2024 to 05-23-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 31102965 | D213 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 15.42 | 5.35 (5.45) | 82.5 (84.04) | |
| 31103044 | D213 | P6 | (103560) AUSTIN POINT | 7PSSDB | 15.87 | 3.85 (3.95) | 61.1 (62.69) | |
| 31102567 | D213 | P6 | (103578) Bumey Rd Sanitary Sewer Extension | 7PSSDB | 15.49 | 5.1 (5.2) | 79 (80.55) | |
| 31103053 | D213 | P6 | (92605) Evergreen 2 WSD | 5PSSDB | 15.88 | 3 (3.1) | 47.64 (49.23) | |
| 31102631 | D213 | P6 | (99889) Fort Bend County Sheriff's Training Facility | 5PSSDB | 15.5 | 3.85 (3.95) | 59.68 (61.23) | |
| 31102947 | D213 | P6 | (87126) Harvest Home Drive St Ded 4 | 5PSSDB | 15.63 | 4.6 (4.7) | 71.9 (73.46) | |
| 31102548 | D213 | P6 | (105927) Harvest Pointe Ph 1 Det | 5PSSDB | 15.49 | 4.2 (4.3) | 65.06 (66.61) | |
| 31102653 | D213 | P6 | (106479) Indigo Sec 1 WSD&Paving | 10PSSDA | 15.62 | 4.2 (4.3) | 65.6 (67.17) | |
| 31103032 | D213 | P6 | (95518) KINGDOM HEIGHT SEC 8 | 10PSSDA | 15.86 | 4.05 (4.15) | 64.23 (65.82) | |
| 31103018 | D213 | P6 | (96838) Lamar Transportation Center #3 | 5PSSDB | 15.86 | 3.85 (3.95) | 61.06 (62.65) | |
| 31102931 | D213 | P6 | (96838) Lamar Transportation Center #3 | 5PSSDB | 15.45 | 3.85 (3.95) | 59.48 (61.03) | |
| 31102615 | D213 | P6 | (PM9837) SH36 NORTH @ PADON Rd | 5PSSDB | 15.5 | 3.85 (3.95) | 59.68 (61.23) | |
| 31102600 | D213 | P6 | (PM9837) SH36 NORTH @ PADON Rd | 5PSSDB | 15.5 | 3.85 (3.95) | 59.68 (61.23) | |
| 31102981 | D213 | P6 | (95317) Wharton US 59 Water and Wastewater Utility Relocat | 5PSSDB | 15.41 | 8.15 (8.25) | 125.59 (127.13) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|