Details
Invoice
- CreationDate
- 05/24/2024
- Vehicle
- D94 - Driver D94
- Work
- 05-17-2024 to 05-23-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 31103010 | D94 | P6 | 101578 | BS-TON | 20.22 | 5.1 (5.2) | 103.12 (105.14) | |
| 31102582 | D94 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 20.18 | 5.35 (5.45) | 107.96 (109.98) | |
| 31102719 | D94 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 20.16 | 5.35 (5.45) | 107.86 (109.87) | |
| 31102795 | D94 | P6 | (106286) 717 const - B22-100 Term Contract for Concrete Pav | 7PSSDB | 20.13 | 5.35 (5.45) | 107.7 (109.71) | |
| 31102999 | D94 | P6 | (87951) Arabella on the Prairie Sec 3 | 5PSSDB | 20.2 | 3.15 (3.25) | 63.63 (65.65) | |
| 31102822 | D94 | P6 | (103560) AUSTIN POINT | 7PSSDB | 20.16 | 3.85 (3.95) | 77.62 (79.63) | |
| 31102928 | D94 | P6 | (103560) AUSTIN POINT | 7PSSDB | 20.23 | 3.85 (3.95) | 77.89 (79.91) | |
| 31102963 | D94 | P6 | (103560) AUSTIN POINT | 7PSSDB | 20.03 | 3.85 (3.95) | 77.12 (79.12) | |
| 31102975 | D94 | P6 | (98615) Buddhist Center | 7PSSDB | 20.09 | 5.35 (5.45) | 107.48 (109.49) | |
| 31102561 | D94 | P6 | (92605) Evergreen 2 WSD | 5PSSDB | 20.21 | 3 (3.1) | 60.63 (62.65) | |
| 31103055 | D94 | P6 | (92605) Evergreen 2 WSD | 5PSSDB | 20.23 | 3 (3.1) | 60.69 (62.71) | |
| 31102761 | D94 | P6 | (97699) Hallimore Ranch 1 WSD | 5PSSDB | 20.19 | 3.85 (3.95) | 77.73 (79.75) | |
| 31102920 | D94 | P6 | (97699) Hallimore Ranch 1 WSD | 10PSSDA | 20.19 | 3.85 (3.95) | 77.73 (79.75) | |
| 31102739 | D94 | P6 | (90714) Harvest Patch Ln Streed Ded. Sec 1 | 5PSSDB | 20.2 | 4.6 (4.7) | 92.92 (94.94) | |
| 31102701 | D94 | P6 | (95518) KINGDOM HEIGHT SEC 8 | 10PSSDA | 20.16 | 4.05 (4.15) | 81.65 (83.66) | |
| 31102775 | D94 | P6 | (95518) KINGDOM HEIGHT SEC 8 | 10PSSDA | 20.17 | 4.05 (4.15) | 81.69 (83.71) | |
| 31103027 | D94 | P6 | (95518) KINGDOM HEIGHT SEC 8 | 10PSSDA | 20.17 | 4.05 (4.15) | 81.69 (83.71) | |
| 31103041 | D94 | P6 | (95518) KINGDOM HEIGHT SEC 8 | 10PSSDA | 20.2 | 4.05 (4.15) | 81.81 (83.83) | |
| 31102874 | D94 | P6 | (95303) McCray Rd Reconstruction & Widening | 7PSSDB | 20.19 | 4.6 (4.7) | 92.87 (94.89) | |
| 31102669 | D94 | P6 | (PM9837) SH36 NORTH @ PADON Rd | 5PSSDB | 20.19 | 3.85 (3.95) | 77.73 (79.75) | |
| 31102902 | D94 | P6 | (105367) Stonecreek Estates Section 10 Paving | 10PSSDA | 20.19 | 3.35 (3.45) | 67.64 (69.66) | |
| 31102618 | D94 | P6 | (102519) Texas State Technical College - Keystone | 5PSSDB | 20.19 | 3.35 (3.45) | 67.64 (69.66) | |
| 31102831 | D94 | P6 | (102519) Texas State Technical College - Keystone | 5PSSDB | 20.15 | 3.35 (3.45) | 67.5 (69.52) | |
| 31102912 | D94 | P6 | (102519) Texas State Technical College - Keystone | 5PSSDB | 20.18 | 3.35 (3.45) | 67.6 (69.62) | |
| 31102848 | D94 | P6 | (90740) TXDOT - FT. BEND - UA 90 - CONTR # 0027-08-180 | 5PSSDB | 20.23 | 4.2 (4.3) | 84.97 (86.99) | |
| 31102638 | D94 | P6 | (97389) Wallingford Park Dr PH 3 WSD&P | 5PSSDB | 19.83 | 4.6 (4.7) | 91.22 (93.2) | |
| 31102940 | D94 | P6 | (95317) Wharton US 59 Water and Wastewater Utility Relocat | 5PSSDB | 20.23 | 8.15 (8.25) | 164.87 (166.9) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|