Details

Invoice


CreationDate
04/05/2024
Vehicle
D20 - Driver D20
Work
03-28-2024 TO 04-04-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34141127 D20 P8 (83046) City of Baytown 2020 St. Recons Project Parts I, I 5PSSDB 23.34 8.4 (8.5) 196.06 (198.39)
34141194 D20 P8 (101513) City of Pasadena - Cotton Patch Drainage 7PSSDB 23.48 5.6 (5.7) 131.49 (133.84)
34141295 D20 P8 (89412) City of Pasadena - Preston 7PSSDB 23.41 5.6 (5.7) 131.1 (133.44)
34141755 D20 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 22.1 5.1 (5.2) 112.71 (114.92)
34141324 D20 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 23.45 5.1 (5.2) 119.59 (121.94)
34141276 D20 P8 (74394) Fountainview Subdivision Drainage Improvements 7PSSDB 23.4 3.85 (3.95) 90.09 (92.43)
34141103 D20 P8 (92433) HC-Barrett Station Ph II Drainage Improvements-Gul 7PSSDB 23.46 5.1 (5.2) 119.65 (121.99)
34141370 D20 P8 (103256) HCESD EMS Station 96 5PSSDB 23.43 5.6 (5.7) 131.21 (133.55)
34141077 D20 P8 (103256) HCESD EMS Station 96 5PSSDB 23.39 5.6 (5.7) 130.98 (133.32)
34141237 D20 P8 (103256) HCESD EMS Station 96 5PSSDB 23.44 5.6 (5.7) 131.26 (133.61)
34141478 D20 P8 (103552) Herman Logistic 5PSSDB 23.46 4.8 (4.9) 112.61 (114.95)
34141355 D20 P8 (91299) HOMEWOOD - FY-2023 -STREET & DRAINAGE REHAB 7PSSDB 23.48 3.35 (3.45) 78.66 (81.01)
34141724 D20 P8 (103283) Innerbelt NW Drainage & Detention 7PSSDB 21.63 5.6 (5.7) 121.13 (123.29)
34141603 D20 P8 (103283) Innerbelt NW Drainage & Detention 7PSSDB 23.41 5.6 (5.7) 131.1 (133.44)
34141544 D20 P8 (102575) JFK REHABILITATION (NERI) 7PSSDB 23.53 4.2 (4.3) 98.83 (101.18)
34141570 D20 P8 (102482) Mason Park - Trail Connector 10PSSDA 23.47 4.8 (4.9) 112.66 (115)
34140862 D20 P8 (72907) NHH Ennis 5PSSDB 23.53 5.1 (5.2) 120 (122.36)
34141429 D20 P8 (72907) NHH Ennis 5PSSDB 23.45 5.1 (5.2) 119.59 (121.94)
34141060 D20 P8 (72907) NHH Ennis 5PSSDB 23.46 5.1 (5.2) 119.65 (121.99)
34141507 D20 P8 (100383) Our Lady of Lourdes 7PSSDB 23.48 5.85 (5.95) 137.36 (139.71)
34141455 D20 P8 (95206) South Pond Non Potable Water Station 10PSSDA 23.37 3.15 (3.25) 73.62 (75.95)
34141215 D20 P8 (71415) TXDOT / SL-8 East Beltway - SAN AUGUSTINE 7PSSDB 23.47 5.55 (5.65) 130.26 (132.61)
34141169 D20 P8 (95913) Urban Air Shell Building 5PSSDB 23.49 5.1 (5.2) 119.8 (122.15)
34140893 D20 P8 (91506) W.C.&I.D. No. 1 2022 Bond Project Water line Impr 5PSSDB 23.58 5.6 (5.7) 132.05 (134.41)
34140878 D20 P8 (97358) Wayside Village Way 5PSSDB 23.55 3.35 (3.45) 78.89 (81.25)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total