Details
Invoice
- CreationDate
- 03/30/2024
- Vehicle
- D203 - Aleisy Vernal
- Work
- 03-22-2024 TO 03-27-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34140537 | D203 | P8 | (86547) Atascocita Dual Diagnosis | 7PSSDB | 24.44 | 4.2 (4.3) | 102.65 (105.09) | |
| 34140378 | D203 | P8 | (101513) City of Pasadena - Cotton Patch Drainage | 7PSSDB | 24.25 | 5.6 (5.7) | 135.8 (138.23) | |
| 34140316 | D203 | P8 | (101513) City of Pasadena - Cotton Patch Drainage | 7PSSDB | 24.38 | 5.6 (5.7) | 136.53 (138.97) | |
| 34140441 | D203 | P8 | (102953) COH - ROBIN ST - 4259-27 | 7PSSDB | 24.32 | 4.8 (4.9) | 116.74 (119.17) | |
| 34140287 | D203 | P8 | (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd | 5PSSDB | 24.29 | 5.1 (5.2) | 123.88 (126.31) | |
| 34140499 | D203 | P8 | (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd | 5PSSDB | 24.28 | 5.1 (5.2) | 123.83 (126.26) | |
| 34140202 | D203 | P8 | (92431) Drainage Improv Farkway Forest | 7PSSDB | 23.78 | 3.85 (3.95) | 91.55 (93.93) | |
| 34140279 | D203 | P8 | (92431) Drainage Improv Farkway Forest | 7PSSDB | 24.37 | 3.85 (3.95) | 93.82 (96.26) | |
| 34140609 | D203 | P8 | (73205) Excavation of Inwood Forest Detention Basin | BS-TON | 24.25 | 4.8 (4.9) | 116.4 (118.83) | |
| 34140214 | D203 | P8 | (102707) GBT Strawberry Build Out | 7PSSDB | 24.24 | 5.85 (5.95) | 141.8 (144.23) | |
| 34140573 | D203 | P8 | (102080) Houston at Ella Blvd - Palladium | 5PSSDB | 24.3 | 4.8 (4.9) | 116.64 (119.07) | |
| 34140475 | D203 | P8 | (98783) Oak Glen Place Subdivision Drainage Improvements | 7PSSDB | 24.31 | 4.05 (4.15) | 98.46 (100.89) | |
| 34140418 | D203 | P8 | (100383) Our Lady of Lourdes | 7PSSDB | 24.28 | 5.85 (5.95) | 142.04 (144.47) | |
| 34140264 | D203 | P8 | (91660) Pasadena Transportation Center | 5PSSDB | 24.22 | 5.85 (5.95) | 141.69 (144.11) | |
| 34140248 | D203 | P8 | (100246) Retail Wastewater Collection System Rehabilitation | 7PSSDB | 23.78 | 7.2 (7.3) | 171.22 (173.59) | |
| 34140232 | D203 | P8 | (94298) SJRA Erosion Repairs for Middle Crossing & N Reser | 10PSSDA | 24.44 | 5.6 (5.7) | 136.86 (139.31) | |
| 34140300 | D203 | P8 | (97826) The Cottage Green Baytown Phase 1 | BS-TON | 24.03 | 8.4 (8.5) | 201.85 (204.26) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|