Details

Invoice


CreationDate
03/29/2024
Vehicle
D18 - Driver D18
Work
03-22-2024 TO 03-27-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34140062 D18 P8 102549 5PSSDB 18.73 5.35 (5.45) 100.21 (102.08)
34139960 D18 P8 102726 7PSSDB 18.96 5.35 (5.45) 101.44 (103.33)
34140132 D18 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 18.93 5.1 (5.2) 96.54 (98.44)
34140031 D18 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 18.88 5.1 (5.2) 96.29 (98.18)
34139930 D18 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 18.79 5.1 (5.2) 95.83 (97.71)
34139887 D18 P8 (PM2660) COH NEWPP 5PSSDB 18.82 3.85 (3.95) 72.46 (74.34)
34139907 D18 P8 (92431) Drainage Improv Farkway Forest 7PSSDB 18.92 3.85 (3.95) 72.84 (74.73)
34139857 D18 P8 (72907) NHH Ennis 5PSSDB 18.8 5.1 (5.2) 95.88 (97.76)
34140100 D18 P8 (98783) Oak Glen Place Subdivision Drainage Improvements 7PSSDB 18.79 4.05 (4.15) 76.1 (77.98)
34140177 D18 P8 (89902) Wayside Village Sec 5 5PSSDB 18.86 3.35 (3.45) 63.18 (65.07)
34140163 D18 P8 (97358) Wayside Village Way 5PSSDB 18.71 3.35 (3.45) 62.68 (64.55)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total