Details

Invoice


CreationDate
03/15/2024
Vehicle
D203 - Aleisy Vernal
Work
03-08-2024 to 03-14-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
PDF (TestA TestRW) - EXCEL (TestA TestRW) -
  
Number Vehicle WorkFrom Order Product Ton Price Total
34139520 D203 P8 (92666) 84" WL - FLINTLOCK - B1 & B2 water supply 5PSSDB 24.32 5.35 (5.45) 130.11 (132.54)
34138896 D203 P8 (100353) CNP Northbelt 5PSLSB 24.38 4.2 (4.3) 102.4 (104.83)
34139281 D203 P8 (100353) CNP Northbelt 5PSLSB 24.31 4.2 (4.3) 102.1 (104.53)
34139454 D203 P8 (100353) CNP Northbelt 5PSLSB 24.38 4.2 (4.3) 102.4 (104.83)
34138917 D203 P8 (101996) CNP Parkway 5PSLSB 24.33 3.85 (3.95) 93.67 (96.1)
34138857 D203 P8 (101996) CNP Parkway 5PSLSB 24.34 3.85 (3.95) 93.71 (96.14)
34138828 D203 P8 (101996) CNP Parkway 5PSLSB 24.31 3.85 (3.95) 93.59 (96.02)
34139240 D203 P8 (101996) CNP Parkway 5PSLSB 24.32 3.85 (3.95) 93.63 (96.06)
34139212 D203 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 24.37 5.1 (5.2) 124.29 (126.72)
34139040 D203 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 24.37 5.1 (5.2) 124.29 (126.72)
34139347 D203 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 24.38 5.1 (5.2) 124.34 (126.78)
34139301 D203 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 24.45 5.1 (5.2) 124.7 (127.14)
34139421 D203 P8 (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd 5PSSDB 23.86 5.1 (5.2) 121.69 (124.07)
34138937 D203 P8 (73205) Excavation of Inwood Forest Detention Basin 10PSSDA 24.4 4.8 (4.9) 117.12 (119.56)
34139110 D203 P8 (73205) Excavation of Inwood Forest Detention Basin 10PSSDA 24.32 4.8 (4.9) 116.74 (119.17)
34139387 D203 P8 (87275) HC Beaumont Place 7PSSDB 24.34 4.05 (4.15) 98.58 (101.01)
34138782 D203 P8 (92433) HC-Barrett Station Ph II Drainage Improvements-Gul 7PSSDB 24.35 5.1 (5.2) 124.18 (126.62)
34138767 D203 P8 (92433) HC-Barrett Station Ph II Drainage Improvements-Gul 7PSSDB 24.56 5.1 (5.2) 125.26 (127.71)
34138798 D203 P8 (84225) HCFCD White Oak Federal Flood Damage Repair 10PSSDA 24.34 4.8 (4.9) 116.83 (119.27)
34138598 D203 P8 (84225) HCFCD White Oak Federal Flood Damage Repair 10PSSDA 24.34 4.8 (4.9) 116.83 (119.27)
34138567 D203 P8 (93193) Humble ISD MS 11 5PSSDB 22.2 4.05 (4.15) 89.91 (92.13)
34138638 D203 P8 (93193) Humble ISD MS 11 5PSSDB 24.3 4.05 (4.15) 98.42 (100.85)
34138755 D203 P8 (93193) Humble ISD MS 11 5PSSDB 24.35 4.05 (4.15) 98.62 (101.05)
34138877 D203 P8 (101479) NEWPP-North Plant Work Pkg 6 7PSSDB 24.47 2.85 (2.95) 69.74 (72.19)
34138842 D203 P8 (101479) NEWPP-North Plant Work Pkg 6 7PSCC 24.39 2.85 (2.95) 69.51 (71.95)
34138658 D203 P8 (72907) NHH Ennis 5PSSDB 24.29 5.1 (5.2) 123.88 (126.31)
34139326 D203 P8 (72907) NHH Ennis 5PSSDB 24.49 5.1 (5.2) 124.9 (127.35)
34139260 D203 P8 (72907) NHH Ennis 5PSSDB 24.35 5.1 (5.2) 124.18 (126.62)
34139193 D203 P8 (72907) NHH Ennis 5PSSDB 24.49 5.1 (5.2) 124.9 (127.35)
34139078 D203 P8 (72907) NHH Ennis 5PSSDB 24.36 5.1 (5.2) 124.24 (126.67)
34139484 D203 P8 (72907) NHH Ennis 5PSSDB 24.31 5.1 (5.2) 123.98 (126.41)
34138985 D203 P8 (98783) Oak Glen Place Subdivision Drainage Improvements 7PSSDB 24.37 4.05 (4.15) 98.7 (101.14)
34138702 D203 P8 (91660) Pasadena Transportation Center 5PSSDB 24.33 5.85 (5.95) 142.33 (144.76)
34139008 D203 P8 (77549) Rd. Recon. W. Gulf Rd 7PSSDB 24.5 4.2 (4.3) 102.9 (105.35)
Tickets count
Remaining tickets


Pendientes

Number Vehicle WorkFrom Order Product Ton Price Total