Details
Invoice
- CreationDate
- 02/24/2024
- Vehicle
- D167 - Jose Zayas
- Work
- 02-16-2024 to 02-22-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34136105 | D167 | P8 | (92666) 84" WL - FLINTLOCK - B1 & B2 water supply | 5PSSDB | 20.78 | 5.35 (5.45) | 111.17 (113.25) | |
| 34136148 | D167 | P8 | (98016) ESD 42/Northwest FS | 5PSSDB | 20.82 | 5.6 (5.7) | 116.59 (118.67) | |
| 34136092 | D167 | P8 | (99153) JLG Site Improvements | 5PSSDB | 20.8 | 5.85 (5.95) | 121.68 (123.76) | |
| 34136115 | D167 | P8 | (16357) Northline Drainage & Paving | 5PSSDB | 20.8 | 3.95 (4.05) | 82.16 (84.24) | |
| 34136137 | D167 | P8 | (16357) Northline Drainage & Paving | 5PSSDB | 20.77 | 3.95 (4.05) | 82.04 (84.12) | |
| 34136051 | D167 | P8 | (98361) Targa - Fire Line | BS-TON | 20.78 | 8.4 (8.5) | 174.55 (176.63) | |
| 34136087 | D167 | P8 | (98361) Targa - Fire Line | HSBT | 1 | 100 (100) | 100 (100) | |
| 34136074 | D167 | P8 | (97826) The Cottage Green Baytown Phase 1 | BS-TON | 20.75 | 8.4 (8.5) | 174.3 (176.38) | |
| 34136125 | D167 | P8 | (87574) Wallisville Road construction from Garth Road to N | 7PSSDB | 20.82 | 8.4 (8.5) | 174.89 (176.97) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|