Details
Invoice
- CreationDate
- 01/19/2024
- Vehicle
- D167 - Jose Zayas
- Work
- 01-12-2024 TO 01-18-2024
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 34132791 | D167 | P8 | (97515) (6999 Wagonwheel Ln) City Wide Project 1 | 9PSCC | 20.81 | 5.85 (5.95) | 121.74 (123.82) | |
| 34132594 | D167 | P8 | 89724 | 5PSSDB | 19.28 | 7.1 (7.2) | 136.89 (138.82) | |
| 34132629 | D167 | P8 | (95808) Blue Heron 2 | 5PSSDB | 19.22 | 8.4 (8.5) | 161.45 (163.37) | |
| 34132514 | D167 | P8 | (96154) Broadway Street Intersection Rehabilitation | 5PSSDB | 13.29 | 5.35 (5.45) | 71.1 (72.43) | |
| 34132515 | D167 | P8 | (96154) Broadway Street Intersection Rehabilitation | SHORTLOADDEL | 1 | 45 (45) | 45 (45) | |
| 34132738 | D167 | P8 | (83046) City of Baytown 2020 St. Recons Project Parts I, I | 5PSSDB | 20.25 | 8.4 (8.5) | 170.1 (172.13) | |
| 34132482 | D167 | P8 | (98321) COH 2023 SWAT CO-4 - WBS 430006-0027-4 - Shepherd | 5PSSDB | 20.92 | 5.1 (5.2) | 106.69 (108.78) | |
| 34132781 | D167 | P8 | (95874) COH FY 2023 # 4- RICHLAND - PO 52 | 10PSCCA | 20.62 | 3.35 (3.45) | 69.08 (71.14) | |
| 34132762 | D167 | P8 | (95009) COH New Multi Use SWMD Facility | 5PSSDB | 20.25 | 4.05 (4.15) | 82.01 (84.04) | |
| 34132827 | D167 | P8 | (98574) COH TDO Panel Replace ( Westminster Dr) | 7PSSDB | 20.74 | 5.6 (5.7) | 116.14 (118.22) | |
| 34132563 | D167 | P8 | (89907) Crosby Farms 7 WSD | 5PSSDB | 19.28 | 5.6 (5.7) | 107.97 (109.9) | |
| 34132438 | D167 | P8 | (95379) Hedwing Village | 10PSSDA | 21.05 | 6.05 (6.15) | 127.35 (129.46) | |
| 34132702 | D167 | P8 | (95379) Hedwing Village | 10PSSDA | 20.29 | 6.05 (6.15) | 122.75 (124.78) | |
| 34132646 | D167 | P8 | (86586) LYB CHO | 7PSSDB | 20.31 | 4.6 (4.7) | 93.43 (95.46) | |
| 34132659 | D167 | P8 | (79393) MiTek Bammel | 5PSSDB | 20.25 | 5.35 (5.45) | 108.34 (110.36) | |
| 34132651 | D167 | P8 | (90882) Northbelt Industrial | 5PSSDB | 20.3 | 4.8 (4.9) | 97.44 (99.47) | |
| 34132810 | D167 | P8 | (71415) TXDOT / SL-8 East Beltway - SAN AUGUSTINE | 7PSSDB | 20.78 | 5.55 (5.65) | 115.33 (117.41) | |
| 34132580 | D167 | P8 | (89902) Wayside Village Sec 5 | 5PSSDB | 19.18 | 3.35 (3.45) | 64.25 (66.17) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|