Details
Invoice
- CreationDate
- 11/25/2023
- Vehicle
- D21 - Driver D21
- Work
- 11-17-2023 TO 11-21-2023
Check
Direct Pay
Bonus
Toll
Bonus + Toll
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total | |
|---|---|---|---|---|---|---|---|---|
| 37102932 | D21 | P11 | (94708) (3700 Bissonnet St) City Wide Project 1 | 9PSCC | 16.07 | 6.05 (6.15) | 97.22 (98.83) | |
| 37102632 | D21 | P11 | (94726) HCTRA 338 / SPENCER / 17038 | 7PSSDB | 16.01 | 5.6 (5.7) | 89.66 (91.26) | |
| 71054955 | D21 | P13 | (88222) Kemah Crossing Sec 3 | 5PSSDB | 16.63 | 6.35 (6.45) | 105.6 (107.26) | |
| 71054972 | D21 | P13 | (88222) Kemah Crossing Sec 3 | 5PSSDB | 16.4 | 6.35 (6.45) | 104.14 (105.78) | |
| 71054997 | D21 | P13 | (92011) PVC Exxon Webster | 7PSSDB | 16.52 | 5.85 (5.95) | 96.64 (98.29) | |
| 71054935 | D21 | P13 | (92011) PVC Exxon Webster | HSBT | 1 | 50 (50) | 50 (50) | |
| 71054921 | D21 | P13 | (92011) PVC Exxon Webster | 7PSSDB | 16.66 | 5.85 (5.95) | 97.46 (99.13) | |
| 71054894 | D21 | P13 | (92011) PVC Exxon Webster | 7PSSDB | 16.72 | 5.85 (5.95) | 97.81 (99.48) | |
| 71055007 | D21 | P13 | (92011) PVC Exxon Webster | HSBT | 1 | 75 (75) | 75 (75) | |
| 71054911 | D21 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 16.64 | 4.8 (4.9) | 79.87 (81.54) | |
| 71054934 | D21 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 16.72 | 4.8 (4.9) | 80.26 (81.93) | |
| 71054966 | D21 | P13 | (93759) SAMARA SEC 9 & SAMARA WAY | 5PSSDB | 16.63 | 4.8 (4.9) | 79.82 (81.49) | |
| 71055044 | D21 | P13 | (89432) Sleepy Hollow Repackage Storm Sewer | 7PSSDB | 16.54 | 5.1 (5.2) | 84.35 (86.01) | |
| 71055031 | D21 | P13 | (39108) TXDOT Harris Co. SH146 | 7PSSDB | 16.53 | 7.9 (8) | 130.59 (132.24) |
- Tickets count
- Remaining tickets
Pendientes
| Number | Vehicle | WorkFrom | Order | Product | Ton | Price | Total |
|---|